NORWAY · WELLBORES · NPDID 4765

25/4-8

Exploration · Appraisal · P&A · Oil/gas · Marathon Petroleum Norge AS · Alvheim · PL 203

5 documents: reports, logs, and plots →

25/4-8 is an appraisal exploration wellbore in the North Sea, drilled by Marathon Petroleum Norge AS, entered Jun 3, 2003, to 2,286 m in the Heimdal Fm.

Discovery 25/4-3 (Gekko) · On the map →

2,286
m total depth · 2,286 m vertical
122
m water depth
Jun 3, 2003
entered · completed Jun 22, 2003
Heimdal Fm
at total depth · Paleocene
51.7
m of core in 2 cores
—
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED NOV 4, 2026 · RELEASED JUN 22, 2005

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
DEEPSEA BERGEN decom · Semisub steel
Drilling days
20
Kelly bushing elevation
23 m
Maximum inclination
0.69999999°
Drilling permit
1065-L
Licensing round
15
Plugged and abandoned
—
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
59.51454° N, 2.06312° E
Hydrocarbons in
Heimdal Fm · Paleocene

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

Well 25/4-8 was the second exploratory test of a large, irregular 4-way closure known as the Gekko structure, discovered by well 25/4-3 in 1974. The reservoir target was the Paleocene Heimdal formation, in a mapped culmination 1.7 km to the WNW of the discovery well. While well 25/4-3 found 8 m of hydrocarbons in a structurally low position, well 25/4-8 was expected to encounter a hydrocarbon column of 45m with an anticipated oil/water contact at 2107 m TVD SS.

Operations and results

Wildcat well 25/8-4 was spudded with the semi-submersible installation Deepsea Bergen on 3 June 2003 and drilled to TD at 2286 m in the Paleocene Heimdal Formation. Some problems with hole fill were experienced in the top 36" hole and repeated drill string stalling and stucking in the 17 1/2" section. After setting the 13 3/8" casing at 796 m these problems ceased and the well was drilled on to TD with no significant problems. The well was drilled with seawater down to 803 m and with Carbosea oil based mud from 803 m to TD.

Significant gas peaks were recorded in the interval 2096 m to 2129 m. Drilled cuttings were adversely affected by the use of PDC bits, especially in the sandstone intervals, and hydrocarbon shows were affected by the use of oil-based mud in the 8 1/2" hole section. Oil shows were however recorded on cores from 2082 m to 2134 m. Petrophysical evaluation of wire line logs acquired demonstrated that sands within the Lista Formation were gas bearing and that the Heimdal Formation is gas and oil bearing at the location with a gas-oil contact (GOC) at 2121.8 m (2098.8 m TVD SS) and an oil-water contact (OWC) at 2128.5 m (2105.5 m TVD SS). The OWC was 1.5 m shallow compared to that described for the exploration well 25/4-3 and is consistent with shows described from core and cuttings within the Heimdal. Two conventional cores were cut in the interval 2082 m to 2136 m in the Lista and Heimdal Formations. Fluid s

Around this wellbore

This wellbore on Sodir FactPages → · Press release →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/4765, documented in the API reference.