NORWAY · WELLBORES · NPDID 477
25/2-9
Exploration · Appraisal · P&A · Oil/gas · Elf Petroleum Norge AS · Øst Frigg · PL 026
25/2-9 is an appraisal exploration wellbore in the North Sea, drilled by Elf Petroleum Norge AS, entered Jun 15, 1985, to 2,297 m in the Balder Fm.
Discovery 25/2-1 Øst Frigg · On the map →
- 2,297
- m total depth · 2,297 m vertical
- 112.5
- m water depth
- Jun 15, 1985
- entered · completed Jul 24, 1985
- Balder Fm
- at total depth · Eocene
- 170.1
- m of core in 12 cores
- 57
- °C bottom-hole temperature
SODIR FACTPAGES · RECORD UPDATED MAR 1, 2026 · RELEASED JUL 24, 1987
On file for this wellbore
What the Directorate holds from this wellbore. Each opens the section that lists it.
Drilling
- Drilling facility
- NORTRYM · Semisub steel
- Drilling days
- 40
- Kelly bushing elevation
- 25 m
- Maximum inclination
- 0°
- Drilling permit
- 470-L
- Licensing round
- 2-A
- Plugged and abandoned
- —
- Core samples available
- Yes
- Cuttings samples available
- Yes
- Position · ED50
- 59.88616° N, 2.37086° E
- Hydrocarbons in
- Frigg Fm · Eocene
Well history
WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE
General
Well 25/2-9 was designed to drill an assumed top in the eastern part of the Frigg East Beta structure, one of the Frigg Satellites, discovered by well 25/2-1 in 1973. The main objects of this well was to reveal petrophysical characteristics in an area where development wells could be located, to appraise the gas column height and gas in place, to get static formation pressure in order to estimate communication with the main Frigg field, and to obtain cores from the upper part of the Frigg Formation and the Balder formation for static and dynamic petrophysical measurements. Prognosed depth of the Frigg Formation was 1922 m, and planned TD was 2450 m.
Operations and results
Appraisal well 25/2-9 was spudded with Golar Nor Offshore A/S semi-submersibel rig Nortrym on 14 June 1985 and completed 24 July 1985 at a depth of 2297 m in the Paleocene Balder Formation. At 2297 m 800 l/min of mud was lost due to a leakage between 13 3/4" casing and 20" casing. The 9 5/8" casing was set to 888 m and the well was gradually brought under control. During this operation a part of the under-reamer was lost into the hole, and fishing went on for two days.
Top Frigg came in at 1935 m with hydrocarbons from 1935.9 m. Gas/oil contact was encountered at 1960 m, and an oil/water contact at 1972 m with brown oil stain on cuttings down to 2008 m. A total of 12 cores were cut with a total length of 214.25 m with 86% recovery. Ten cores were cut from 1939 m to 2145 m in the upper Frigg Formation, across the hydrocarbon bearing zone and all fluid contacts and two cores were cut from 2220 m to 2256 m in the tuffaceous Balder Formation. The cores consisted mainly of sands, more or less consolidated.
The well was plugged and abandoned as an oil and gas discovery.
Testing
No drill stem test was performed
Around this wellbore
This wellbore on Sodir FactPages →
About this data
Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.
Developers: this page as JSON is GET /v1/data/norway/wells/477, documented in the API reference.