NORWAY · WELLBORES · NPDID 4876

2/1-A-17 A

Development · Production · P&A · Oil · Talisman Energy Norge AS · Gyda · PL 019 B

2/1-A-17 A is a production development wellbore in the North Sea, drilled by Talisman Energy Norge AS, entered Mar 1, 2004, to 5,354 m.

Discovery 2/1-3 Gyda · On the map →

5,354
m total depth · 3,738 m vertical
65.5
m water depth
Mar 1, 2004
entered · completed May 10, 2004
—
at total depth
—
m of core
—
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED SEP 2, 2026 · RELEASED MAY 10, 2006

On file for this wellbore

Nothing yet. The Directorate has no tops, samples, logs, or documents on file for this wellbore; material from a new well is released two years after completion.

Drilling

Drilling facility
GYDA · Jacket 6 legs
Drilling days
71
Kelly bushing elevation
56 m
Maximum inclination
—°
Drilling permit
2379-P
Licensing round
1-A
Plugged and abandoned
Mar 13, 2021
Core samples available
No
Cuttings samples available
No
Position · ED50
56.90481° N, 3.08517° E

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/4876, documented in the API reference.