NORWAY · WELLBORES · NPDID 4902
34/10-48 S
Exploration · Wildcat · P&A · Oil · Statoil ASA (old) · Gimle · PL 050
34/10-48 S is a wildcat exploration wellbore in the North Sea, drilled by Statoil ASA (old), entered Mar 17, 2004, to 7,393 m in the Lunde Fm.
Discovery 34/10-48 S Gimle · On the map →
- 7,393
- m total depth · 2,933 m vertical
- 216.9
- m water depth
- Mar 17, 2004
- entered · completed Dec 22, 2004
- Lunde Fm
- at total depth · Late Triassic
- 33.2
- m of core in 1 core
- 107
- °C bottom-hole temperature
SODIR FACTPAGES · RECORD UPDATED NOV 4, 2026 · RELEASED DEC 22, 2006
On file for this wellbore
What the Directorate holds from this wellbore. Each opens the section that lists it.
Drilling
- Drilling facility
- GULLFAKS C · Condeep 4 shafts
- Drilling days
- 281
- Kelly bushing elevation
- 84.1 m
- Maximum inclination
- 92.59999847°
- Drilling permit
- 1071-L
- Licensing round
- Awarded additionally to round 3
- Plugged and abandoned
- —
- Core samples available
- Yes
- Cuttings samples available
- Yes
- Position · ED50
- 61.21494° N, 2.27439° E
- Hydrocarbons in
- Viking Gp · Late Jurassic
- Hydrocarbons in
- Brent Gp · Middle Jurassic
Well history
WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE
General
Well 34/10-48 S was drilled on the Gullfaks Field in the Northern North Sea, from the Gullfaks C platform. The main objective was to test the hydrocarbon potential of the Brent Group in the Topas prospect. The secondary objectives were to test the hydrocarbon potential in 3 leads; the Nesle lead east of the Topas prospect, the U2 lead in the slope of the Gullfaks Horst and Late Jurassic at the base of the main bounding fault limiting the Gullfaks Structure to the east. The well should be completed as a producer.
Operations and results
Well 34/10-48 S was spudded from a preset 32" conductor at slot 29 on the Gullfaks C platform on 17 March 2004.
The planned well was a very challenging one, with a complex and highly deviated well path. Deviation from vertical was 11 deg at 438 m and was increased to ca 66 deg from 1500 m. When entering the Lunde Formation inclination was 56 deg, and from ca 5500 m in the Brent Group and to TD the well path was kept approximately horizontal. It was planned drilled in 4 sections, 24", 17 1/2", 12 1/4" and 8 1/2". The planned TD of the well was 6848 m. Information gathered while drilling the 8 1/2" section led to a change in plans and the well path in the reservoir was changed and extended with 550 m. The well 48 S was drilled to 7393 m. The well was drilled with spud mud in the 24" section from 443 m to 1355 m, with Glydril mud in the 17 1/2" section from 1355 m to 2610 m, and with Versavert oil based mud in the remaining sections from 2610 m to TD.
The well was classified as exploration well from 3600 m. The Lunde Formation was penetrated at 3657 m. Hydrocarbon filled sandstones in this Formation (the U2 lead) were encountered at 4272 m /2470 m TVD, while the sandstone layer at the base of the main bounding fault, at 4891 m / 2800 m TVD, was water filled. The Topas prospect was penetrated some 7.5 m shallow to prognosis. The well drilled through
Around this wellbore
This wellbore on Sodir FactPages → · Press release →
About this data
Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.
Developers: this page as JSON is GET /v1/data/norway/wells/4902, documented in the API reference.