NORWAY · WELLBORES · NPDID 4915

34/7-J-1 AH

Development · Production · Closed · Oil · Statoil ASA (old) · Tordis · PL 089

34/7-J-1 AH is a production development wellbore in the North Sea, drilled by Statoil ASA (old), entered Apr 15, 2004, to 4,560 m.

Discovery 34/7-12 Tordis · On the map →

4,560
m total depth · 2,177 m vertical
201
m water depth
Apr 15, 2004
entered · completed May 20, 2004
—
at total depth
—
m of core
—
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED OCT 31, 2026 · RELEASED MAY 20, 2006

On file for this wellbore

Nothing yet. The Directorate has no tops, samples, logs, or documents on file for this wellbore; material from a new well is released two years after completion.

Drilling

Drilling facility
BORGLAND DOLPHIN · Semisub steel
Drilling days
36
Kelly bushing elevation
31 m
Maximum inclination
—°
Drilling permit
2410-P
Licensing round
8
Plugged and abandoned
—
Core samples available
No
Cuttings samples available
No
Position · ED50
61.27493° N, 2.11987° E

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/4915, documented in the API reference.