NORWAY · WELLBORES · NPDID 5045

2/1-A-31 A

Development · Production · P&A · Oil · Talisman Energy Norge AS · Gyda · PL 019 B

2/1-A-31 A is a production development wellbore in the North Sea, drilled by Talisman Energy Norge AS, entered Jan 2, 2005, to 6,705 m.

Discovery 2/1-3 Gyda · On the map →

6,705
m total depth · 4,264 m vertical
66
m water depth
Jan 2, 2005
entered · completed Apr 14, 2005
—
at total depth
—
m of core
—
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED SEP 2, 2026 · RELEASED APR 14, 2007

On file for this wellbore

Nothing yet. The Directorate has no tops, samples, logs, or documents on file for this wellbore; material from a new well is released two years after completion.

Drilling

Drilling facility
GYDA · Jacket 6 legs
Drilling days
103
Kelly bushing elevation
56 m
Maximum inclination
—°
Drilling permit
2513-P
Licensing round
1-A
Plugged and abandoned
Mar 2, 2021
Core samples available
No
Cuttings samples available
No
Position · ED50
56.90479° N, 3.08502° E

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/5045, documented in the API reference.