NORWAY · WELLBORES · NPDID 5119

15/12-A-3

Development · Production · Plugged · Oil · Talisman Energy Norge AS · Varg · PL 038

15/12-A-3 is a production development wellbore in the North Sea, drilled by Talisman Energy Norge AS, entered May 15, 2005, to 3,512 m.

Discovery 15/12-4 Varg · On the map →

3,512
m total depth · 3,076.4 m vertical
84
m water depth
May 15, 2005
entered · completed Jun 12, 2005
—
at total depth
—
m of core
—
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED SEP 2, 2026 · RELEASED JUN 12, 2007

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
MÆRSK GIANT · Jack-up 3 legs
Drilling days
29
Kelly bushing elevation
51.5 m
Maximum inclination
—°
Drilling permit
2567-P
Licensing round
3
Plugged and abandoned
Sep 1, 2009
Core samples available
No
Cuttings samples available
No
Position · ED50
58.07794° N, 1.89048° E

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/5119, documented in the API reference.