NORWAY · WELLBORES · NPDID 5121

30/9-F-29 Y1

Development · Production · Producing · Oil · Norsk Hydro Produksjon AS · Oseberg Sør · PL 104

30/9-F-29 Y1 is a production development wellbore in the North Sea, drilled by Norsk Hydro Produksjon AS, entered Jun 22, 2005, to 6,150 m.

Discovery 30/9-10 Oseberg Sør · On the map →

6,150
m total depth · 2,905 m vertical
101
m water depth
Jun 22, 2005
entered · completed Oct 15, 2005
—
at total depth
—
m of core
—
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED OCT 17, 2026 · RELEASED OCT 15, 2007

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
OSEBERG SØR · Jacket 6 legs
Drilling days
116
Kelly bushing elevation
67 m
Maximum inclination
—°
Drilling permit
2569-P1
Licensing round
9
Plugged and abandoned
—
Core samples available
No
Cuttings samples available
No
Position · ED50
60.39011° N, 2.79704° E

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/5121, documented in the API reference.