24/12-1 R is a wildcat exploration wellbore in the North Sea, drilled by Den norske stats oljeselskap a.s, entered Jun 7, 1978, to 4,825 m in the No Group Defined.

On the map →

4,825
m total depth · 4,825 m vertical
113
m water depth
Jun 7, 1978
entered · completed Aug 14, 1978
No Group Defined
at total depth · Triassic
10.8
m of core in 3 cores
141
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED MAR 1, 2026 · RELEASED AUG 14, 1980

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
TREASURE SEEKER · Semisub steel
Drilling days
69
Kelly bushing elevation
25 m
Maximum inclination
0°
Drilling permit
189-L2
Licensing round
3
Plugged and abandoned
Aug 14, 1978
Core samples available
Yes
Cuttings samples available
No
Position · ED50
59.04161° N, 1.88276° E

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

Well 24/12-1 R is located on the Gudrun Terrace, about 15 km east of British sector. The purpose of the well was to evaluate a seismic closure, named Gamma, in the southern part of the Block. The main objective was the Middle Jurassic sands. Well 24/12-1 R is a re-entry of well 24/12-1, which was suspended after setting the 9 5/8" casing at a TD of 3966 m in the Early Cretaceous.

Operations and results

Wildcat well 24/12-1 R was spudded with the semi-submersible installation Treasure Seeker on 7 June 1978 and drilled to TD at 4825 meter in the Triassic Group. Three cement plugs were drilled in the 9 5/8" casing using the existing mud left in the hole before re-entry. The 9 5/8" casing shoe was drilled out at 3966 meters using 1.93 - 1.94 R.D. mud weight. After drilling the shoe, circulation and rotation stopped as the pipe stuck at 3968 meters. The pipe was freed and pipe rubbers that had been stripped were circulated out. Resumed drilling and raised mud wt. to 2.00 R.D. Ran core barrel from 4160 meters to 4182 meters, after running core barrel raised mud weight in active system to 2.04 R.D. due to background gas. Turbine drilling was continued to TD. When the sub sea assembly was pulled when abandoning the well it was realized that the rig for some time during the operation must have been off location. Severe wear on the flex-joint and bag preventers was discovered. This probable rig offset also caused several of the drill pipe rubber protectors to be torn off, which probably caused the stuck pipe at 3968 m. The rubbers were circulated out of the hole during several days and caused directly or indirectly many days of lost rig-time. The well was drilled with a Spersene / XP-20 / Resinex lignosulphonate / lignite mud system from re-entry depth to TD.

The Late Jurassic Draupne Formation was encountered at 4055 m and was 85 m thick. Below this depth 210 m of alternating Heather Formation shale and Intra

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/513, documented in the API reference.