NORWAY · WELLBORES · NPDID 5135
35/2-1
Exploration · Wildcat · Suspended · Gas · Norsk Hydro Produksjon AS · PL 318
35/2-1 is a wildcat exploration wellbore in the North Sea, drilled by Norsk Hydro Produksjon AS, entered Jul 23, 2005, to 713 m in the Nordland Gp.
Discovery 35/2-1 (Peon) · On the map →
- 713
- m total depth · 713 m vertical
- 384
- m water depth
- Jul 23, 2005
- entered · completed Aug 28, 2005
- Nordland Gp
- at total depth · Late Pliocene
- —
- m of core
- 24
- °C bottom-hole temperature
SODIR FACTPAGES · RECORD UPDATED NOV 4, 2026 · RELEASED AUG 28, 2007
On file for this wellbore
What the Directorate holds from this wellbore. Each opens the section that lists it.
Drilling
- Drilling facility
- DEEPSEA TRYM · Semisub steel
- Drilling days
- 39
- Kelly bushing elevation
- 25 m
- Maximum inclination
- 1.20000005°
- Drilling permit
- 1098-L
- Licensing round
- 18
- Plugged and abandoned
- —
- Core samples available
- Yes
- Cuttings samples available
- Yes
- Position · ED50
- 61.89074° N, 3.34288° E
- Hydrocarbons in
- Nordland Gp · Pleistocene
Well history
WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE
General
Wildcat well 35/2-1 is located on the Tampen Spur about one block west of the Agat discovery in the northern North Sea. The well should test the Peon prospect, a Pleistocene glaciofluvial / glaciomarine sand body. The very shallow prospect was based on a regional angular unconformity, an important boundary formed by glacier ice, separating steeply dipping Pliocene strata from sub-horizontal strata of Pleistocene age. The primary objectives were to test the presence and type of hydrocarbons in the prospect. The location was chosen close to the apex of a mound structure in the prospect, in an area where there was good HC indication and leaving acceptable up-dip volumes.
Operations and results
Well 35/2-1 was spudded with the semi-submersible installation Deepsea Trym on 21 July 2005 and drilled to TD at 713 m in Pleistocene sediments of the Nordland Group. The well was first spudded to the North of the final position and a 9 7/8" Pilot hole was drilled to 544 m. During drilling of the 36? hole opening the BHA parted in a drill collar connection. The BHA was left in the hole. The rig was moved 20m to the south and re-spudded. The well was drilled in a total of 39.7 days which was 5.8 days behind the AFE (33.9 days). The down time was mainly caused by operational and equipment failures including problems to get a pressure test on the P&A top cement plug. The well was drilled with water based mud.
Top Peon formation was found at 574 m. An 18.7 meter thick interval of dry gas was encountered in the 37.8 meter thick formation. The proven gas column was 18 m thinner than expected. The reservoir sand was homogeneous, but much unconsolidated, with likely permeability in the Darcy range. The petrophysical interpretation showed very good properties with an average porosity of 0.33, a net to gross of 0.99 and a water saturation of 0.12. The Gas Water Contact was estimated to be at 593 m (568m TVD MSL) from pressure evaluation a
Around this wellbore
This wellbore on Sodir FactPages → · Press release →
About this data
Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.
Developers: this page as JSON is GET /v1/data/norway/wells/5135, documented in the API reference.