NORWAY · WELLBORES · NPDID 515
17/9-1 R
Exploration · Wildcat · P&A · Dry · Esso Exploration and Production Norway A/S · PL 002
17/9-1 R is a wildcat exploration wellbore in the North Sea, drilled by Esso Exploration and Production Norway A/S, entered May 18, 1974, to 3,161 m in the Skagerrak Fm.
- 3,161
- m total depth · 3,161 m vertical
- 159
- m water depth
- May 18, 1974
- entered · completed Jun 11, 1974
- Skagerrak Fm
- at total depth · Late Triassic
- 4.9
- ft of core in 3 cores
- 62
- °C bottom-hole temperature
SODIR FACTPAGES · RECORD UPDATED FEB 20, 2026 · RELEASED JUN 11, 1976
On file for this wellbore
What the Directorate holds from this wellbore. Each opens the section that lists it.
Drilling
- Drilling facility
- GLOMAR GRAND ISLE · Vessel
- Drilling days
- 25
- Kelly bushing elevation
- 9 m
- Maximum inclination
- 0°
- Drilling permit
- 93-L2
- Licensing round
- 1-A
- Plugged and abandoned
- Jun 11, 1974
- Core samples available
- Yes
- Cuttings samples available
- Yes
- Position · ED50
- 58.47424° N, 3.83783° E
Well history
WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE
General
Well 17/9-1R is located in the Åsta Graben in the North Sea, ca 30 km north of the 17/12-1R Bream Discovery well. The primary objective was to evaluate sands at the base of the Jurassic sequence. The structure is not associated with mobile salt, which is the case for the Bream Discovery. The first entry was suspended on 6 November 1973 at 2816 m when the riser was lost in a storm. The re-entry 17/9-1R was made to recover and repair the damaged stack on the sea floor. A deeping program was designed to 3658 m to test the Triassic and possible Zechstein sand intervals. Also a complete logging program was designed to include the portion of original hole below 2616 m, which was not logged due to storm damage to drill ship.
Operations and results
Well 17/9-1 was re-entered (17/9-1R) with the drill ship Glomar Grand Isle on 12 May 1974. The broken BOP stack left on the original hole was recovered and repaired by divers. A total of 7 days and 11 lock-out dives in 159 m water depth were required for these operations. After successful re-entry well bore 17/9-1R was drilled to TD at 3161 m in Late Triassic sand and shale of the Skagerrak Formation. The well bore was drilled with a lignosulphonate/seawater mud from re-entry point to TD.
The upper section of the Skagerrak Formation, from 2999.2 m to 3029.7 m, had sandstone with apparent porosity and questionable traces of dead oil. Sands penetrated in the interval from 3109 m to TD had no shows. The sands were found in thin zones and the potential reservoir quality was considered very poor. Organic geochemical analyses detected no significant source rock potential in the re-entry; the Late Jurassic shales penetrated in the first entry (17/9-1) thus remain as the only significant source rock in the total well bore. The well was found immature; possibly marginally mature towards the Late Triassic at TD (%Ro = 0.5). One organic geochemical study (Robertson Research) inferred "traces
Around this wellbore
This wellbore on Sodir FactPages →
About this data
Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.
Developers: this page as JSON is GET /v1/data/norway/wells/515, documented in the API reference.