NORWAY · WELLBORES · NPDID 517

15/6-2 R

Exploration · Appraisal · P&A · Gas/condensate · Esso Exploration and Production Norway A/S · Gina Krog · PL 029

3 documents: reports, logs, and plots →

15/6-2 R is an appraisal exploration wellbore in the North Sea, drilled by Esso Exploration and Production Norway A/S, entered May 9, 1974, to 4,779 m in the Zechstein Gp.

Discovery 15/5-1 Gina Krog · On the map →

4,779
m total depth · 4,779 m vertical
115
m water depth
May 9, 1974
entered · completed Aug 1, 1974
Zechstein Gp
at total depth · Late Permian
64
ft of core in 5 cores
91
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED NOV 4, 2026 · RELEASED AUG 1, 1976

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
DRILLMASTER · Semisub steel
Drilling days
85
Kelly bushing elevation
24 m
Maximum inclination
0°
Drilling permit
62-L2
Licensing round
2-A
Plugged and abandoned
Aug 1, 1974
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
58.54655° N, 1.69836° E
Hydrocarbons in
Hugin Fm · Middle Jurassic

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

Well 15/6-2 R is a re-entry of well 15/6-2 in the Ve Sub-basin in the North Sea, ca 5 km north of the Sleipner Field. The initial well 16/6-2 was drilled to 3131 m in the Shetland Group with the drill vessel Glomar Grand Isle. The well found good shows in Paleocene sandstones and was suspended in October 1971. The primary objective of the re-entry was to deepen the well and test the Dogger (Middle Jurassic) deltaic sands. A secondary objective was to test the Lias section (Early Jurassic).

Operations and results

Wildcat well 15/6-2 re-entered on 9 May 1974. It was drilled with the semi-submersible installation Drillmaster to TD at 4779 m in the Late Permian Zechstein Group. The pipe stuck temporarily three times in intervals below 4602 m. Due to hole problems and tight spots no logs were run below 4611 m The well was drilled with a seawater /lignosulphonate mud from re-entry point to TD.

The only hydrocarbon reservoir penetrated was the Dogger gas-condensate sands from 3582 to 3641 m. The lower part of Dogger section and all of the Lias section were cut out of this test by an erosional unconformity and/or faulting. The missing interval has good potential for additional reservoir quality sands. In addition, the Late Triassic has good sand development that could be adequate for reservoiring hydrocarbons. During the drilling of the Triassic and Permian section (3688 to TD), the background gas in mud and cuttings was near zero, which probably is related to lack of source material for hydrocarbons.

No shows were recorded except in Dogger.

Five cores were cut with 100% recovery in the interval 3582.3 to 3641.1 m. A total of eigh

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/517, documented in the API reference.