NORWAY · WELLBORES · NPDID 5199

15/12-A-5 A

Development · Production · P&A · Oil · Talisman Energy Norge AS · Varg · PL 038

15/12-A-5 A is a production development wellbore in the North Sea, drilled by Talisman Energy Norge AS, entered Sep 26, 2005, to 3,701 m.

Discovery 15/12-4 Varg · On the map →

3,701
m total depth · 3,057 m vertical
84
m water depth
Sep 26, 2005
entered · completed Sep 30, 2005
—
at total depth
—
m of core
—
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED SEP 2, 2026 · RELEASED SEP 30, 2007

On file for this wellbore

Nothing yet. The Directorate has no tops, samples, logs, or documents on file for this wellbore; material from a new well is released two years after completion.

Drilling

Drilling facility
MÆRSK GIANT · Jack-up 3 legs
Drilling days
5
Kelly bushing elevation
51.5 m
Maximum inclination
—°
Drilling permit
2613-P
Licensing round
3
Plugged and abandoned
Jan 26, 2018
Core samples available
No
Cuttings samples available
No
Position · ED50
58.07791° N, 1.89044° E

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/5199, documented in the API reference.