NORWAY · WELLBORES · NPDID 52

15/3-5

Exploration · Appraisal · P&A · Oil · Elf Petroleum Norge AS · PL 025

7 documents: reports, logs, and plots →

15/3-5 is an appraisal exploration wellbore in the North Sea, drilled by Elf Petroleum Norge AS, entered Dec 28, 1983, to 4,130 m in the Sleipner Fm.

Discovery 15/3-4 (Sigrun) · On the map →

4,130
m total depth · 4,130 m vertical
110
m water depth
Dec 28, 1983
entered · completed May 13, 1984
Sleipner Fm
at total depth · Middle Jurassic
—
m of core
115
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED MAR 1, 2026 · RELEASED MAY 13, 1986

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
BYFORD DOLPHIN · Semisub steel
Drilling days
138
Kelly bushing elevation
25 m
Maximum inclination
0°
Drilling permit
397-L
Licensing round
2-A
Plugged and abandoned
—
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
58.78696° N, 1.84281° E
Hydrocarbons in
Sleipner Fm · Middle Jurassic

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

Well 15/3-5 was drilled on the Gudrun Terrace, east of the 15/3-1 S Gudrun Discovery in the North Sea. Well 15/3-5 was drilled in a downdip position of a structure explored by the well 15/3-4, where oil bearing reservoirs of Middle Jurassic age were tested. The main objectives of 15/3-5 were to find the extension of these reservoirs and to define a hydrocarbon/water contact.

Operations and results

Appraisal well 15/3-5 was spudded with the semi-submersible installation Byford Dolphin on 28 December 1983 and drilled to TD at 4130 m in the Middle Jurassic Sleipner Formation. Drilling was suspended at 195 m due to bad weather. The well was re-spudded on 6 January 25 m west of the original location. Some technical problems with the BOP occurred after setting of the 20" and 13 3/8" casings. A seat protector got stuck in the riser during drilling of the 17 1/2" hole. Drilling breaks occurred at 3943 m, 3954 m, 4018 m, 4032 m and at 4041 4043 m in the 8 1/2" hole section. The well was drilled using water based mud.

Top Draupne Formation was encountered at 3808 m, followed by the Heather Formation at 3881 m, and the target Middle Jurassic Sleipner Formation at 3935 m. Several thin reservoir zones were penetrated in the Sleipner Formation. The sands were interpreted as minor fluvial channels (2 to 5m in thickness) deposited in two main sequences. Four of the channels were oil-bearing with an oil gradient of 0.61 bar/10 m based on pressure measurements. An OWC could be established at 4022.6 m. Pressure measurements showed that the upper fluvial channel sequence is over-pressured, and not in contact with the sands encountered in well 15/3-4. The lower fluvial sequence could be connected between the two wells. Petro

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/52, documented in the API reference.