NORWAY · WELLBORES · NPDID 5241

25/11-G-10 Y2

Development · Production · Plugged · Oil · Norsk Hydro Produksjon AS · Grane · PL 169 B1

25/11-G-10 Y2 is a production development wellbore in the North Sea, drilled by Norsk Hydro Produksjon AS, entered Jan 12, 2006, to 4,316 m.

Discovery 25/11-15 Grane · On the map →

4,316
m total depth · 1,826 m vertical
128
m water depth
Jan 12, 2006
entered · completed Jan 27, 2006
—
at total depth
—
m of core
—
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED SEP 2, 2026 · RELEASED JAN 27, 2008

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
GRANE · Jacket 8 legs
Drilling days
16
Kelly bushing elevation
69.9 m
Maximum inclination
—°
Drilling permit
2651-P2
Licensing round
13
Plugged and abandoned
May 19, 2019
Core samples available
No
Cuttings samples available
No
Position · ED50
59.16528° N, 2.48728° E

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/5241, documented in the API reference.