NORWAY · WELLBORES · NPDID 5376

35/2-1 R

Exploration · Wildcat · P&A · Gas · Norsk Hydro Produksjon AS · PL 318

2 documents: reports, logs, and plots →

35/2-1 R is a wildcat exploration wellbore in the North Sea, drilled by Norsk Hydro Produksjon AS, entered Jun 15, 2006, to 713 m in the Nordland Gp.

Discovery 35/2-1 (Peon) · On the map →

713
m total depth · 706 m vertical
384
m water depth
Jun 15, 2006
entered · completed Jul 25, 2006
Nordland Gp
at total depth · Late Pliocene
—
m of core
24
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED NOV 4, 2026 · RELEASED JUL 25, 2008

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
DEEPSEA TRYM · Semisub steel
Drilling days
41
Kelly bushing elevation
25 m
Maximum inclination
1.20000005°
Drilling permit
1098-L2
Licensing round
18
Plugged and abandoned
Sep 11, 2015
Core samples available
No
Cuttings samples available
No
Position · ED50
61.89074° N, 3.34288° E
Hydrocarbons in
Nordland Gp · Pleistocene

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

Well 35/2-1 R is a re-entry of well 35/2-1 on the Tampen Spur about one block west of the Agat discovery in the northern North Sea. The 35/2-1 well was a dry gas discovery in the Pleistocene Peon sandstone member of the Nordand Group. Top Peon sandstone member was at 574 m (165 m below sea floor). The objective of the re-entry was testing and permanent abandonment.

Operations and results

Well 35/2-1 was re-entered (35/2-1 R) with the semi-submersible installation Deepsea Trym 15 June 2006. Upon re-entering the well it was discovered that some gas bubbles were leaking up to the surface around the conductor. The DVD recordings from the ROV showed that the gas flow was very low. Based on the short distance from the reservoir and the poor cement bonding detected behind the casings, decision was made to halt the operation and not perform the planned Drill Stem Test operation.

The reservoir temperature at 574 m was estimated between the MDT measurement (35/21) of 14.3 deg C and the EMS measurement (35/21 R) of 16.8 deg C. The MDT reading could have been influenced by gas cooling and the EMS reading could have been influenced by the heating effect as a result of about 9 hours spent drilling out cement and cleaning the hole in and below the reservoir section.

No cores were cut and no fluid samples were taken.

The well was permanently abandoned on 25 July 2006.

Testing

No drill stem test was performed.

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.