30/9-3
Exploration · Wildcat · P&A · Oil · Norsk Hydro Produksjon AS · Oseberg Sør · PL 079
30/9-3 is a wildcat exploration wellbore in the North Sea, drilled by Norsk Hydro Produksjon AS, entered Dec 31, 1983, to 3,113 m in the Drake Fm.
Discovery 30/9-3 Oseberg Sør · On the map →
- 3,113
- m total depth · 3,113 m vertical
- 110
- m water depth
- Dec 31, 1983
- entered · completed Feb 26, 1984
- Drake Fm
- at total depth · Early Jurassic
- 223
- m of core in 15 cores
- 57
- °C bottom-hole temperature
SODIR FACTPAGES · RECORD UPDATED NOV 4, 2026 · RELEASED FEB 26, 1986
On file for this wellbore
What the Directorate holds from this wellbore. Each opens the section that lists it.
Drilling
- Drilling facility
- NORTRYM · Semisub steel
- Drilling days
- 58
- Kelly bushing elevation
- 25 m
- Maximum inclination
- 0°
- Drilling permit
- 400-L
- Licensing round
- Awarded additionally to round 6
- Plugged and abandoned
- —
- Core samples available
- Yes
- Cuttings samples available
- Yes
- Position · ED50
- 60.47120° N, 2.76043° E
- Hydrocarbons in
- Ness Fm · Middle Jurassic
Well history
WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE
General
Well 30/9-3 was drilled on the Gamma West structure on the Oseberg Fault Block in the northern North Sea. The primary objective was to find hydrocarbon accumulations in the Middle Jurassic Brent Group. Secondary objective was to find additional hydrocarbon accumulations in the Early Jurassic. Planned TD was ca 75 m below a possible intra Triassic marker to a depth of 4188 +/- 100 m
Operations and results
Wildcat well 30/9-3 was spudded with the semi-submersible installation Nortrym on 31 December 1983. The well was drilled to a depth of 3113 m into Drake Formation shales where the pipe got stuck and parted when pulling out of hole for logging. The fish was not recovered and no wire line logs were recorded below 1713.5 m due to fish in hole. All lithostratigraphic interpretation below this point is therefore based on cuttings description, core description, chromatograph data and ROP information. A sidetrack was decided to complete the well programme. The well was drilled with spud mud down to 625 m and with Invermul/EZmul Oil Based Mud from 625 m to TD.
The Brent Group (2712-3045 m) consisted of a 259 m thick Ness Formation (2712 - 2971 m) made up of sandstones with stringers of shale, siltstone and coal and 74 m of Etive Formation (2971 - 3045m) sandstones. Based on chromatograph analysis on hydrocarbon samples extracted from core samples a GOC was found at ca 2734 m and an OWC at ca 2815 m, both located in the Ness Formation. From core and chromatograph data the Ness Formation had a gross pay of 103 m. The net gas pay was estimated to 22 m and the net oil pay to 36 m giving a total net pay of 58 m (cut off values porosity < 12%, permeability < l mD). The average porosity was calculated from cores to 22.5 % and average
Around this wellbore
This wellbore on Sodir FactPages →
About this data
Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.
Developers: this page as JSON is GET /v1/data/norway/wells/55, documented in the API reference.