NORWAY · WELLBORES · NPDID 555

2/4-A-1

Development · Production · Junked · Not applicable · Phillips Petroleum Company Norway · Ekofisk · PL 018

2/4-A-1 is a production development wellbore in the North Sea, drilled by Phillips Petroleum Company Norway, entered Sep 18, 1978, to 4,553.1 m.

Discovery 2/4-2 Ekofisk · On the map →

4,553.1
m total depth · 3,328 m vertical
70
m water depth
Sep 18, 1978
entered · completed Feb 6, 1979
—
at total depth
—
m of core
—
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED SEP 2, 2026 · RELEASED FEB 6, 1981

On file for this wellbore

Nothing yet. The Directorate has no tops, samples, logs, or documents on file for this wellbore; material from a new well is released two years after completion.

Drilling

Drilling facility
EKOFISK A · Jacket 8 legs
Drilling days
142
Kelly bushing elevation
33 m
Maximum inclination
—°
Drilling permit
119-P
Licensing round
1-A
Plugged and abandoned
Sep 28, 1987
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
56.52087° N, 3.22307° E

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/555, documented in the API reference.