NORWAY · WELLBORES · NPDID 5626

6609/6-1

Exploration · Wildcat · P&A · Dry · Norsk Hydro Petroleum AS · PL 286

1 document: reports, logs, and plots →

6609/6-1 is a wildcat exploration wellbore in the Norwegian Sea, drilled by Norsk Hydro Petroleum AS, entered Sep 17, 2007, to 2,710 m in the Red Beds (informal).

On the map →

2,710
m total depth · 2,709 m vertical
330
m water depth
Sep 17, 2007
entered · completed Nov 7, 2007
Red Beds (informal)
at total depth · Late Triassic
—
m of core
92
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED FEB 20, 2026 · RELEASED NOV 7, 2009

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
POLAR PIONEER · Semisub steel
Drilling days
52
Kelly bushing elevation
23 m
Maximum inclination
6.69999981°
Drilling permit
1156-L
Licensing round
17
Plugged and abandoned
—
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
66.69991° N, 9.93367° E

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

Well 6609/6-1 is located on the Grønøy High between the Træna Basin in the north and the Helgeland Basin in the south. The primary target was to test the hydrocarbon potential in the Snøhetta A1 structure with reservoir in the Late Cretaceous Lysing Formation. Secondary target was the Eocene Flantorsk Brygge AVO anomaly.

Operations and results

Well 6609/6-1 was spudded with the semi-submersible installation Polar Pioneer on 17 September 2007 and drilled to TD at 2710 m in the Late Triassic Red Beds. No significant problem was encountered in the operations. The well was drilled with seawater down to 1114 m, and with polymer mud from 1114 m to TD.

The Flantorsk proved to contain only traces of sand with no hydrocarbon shows. The main objective in the Lysing Formation proved only minor, water bearing sands with no hydrocarbon shows. Both the Flantorsk lead and the main objective in the Lysing Formation were logged on wire line. Sandstones with reservoir quality were also encountered in the Triassic interval (2644 m to TD). The CPI indicated some possible residual HC-saturation in the best sands in the Triassic, but this was interpreted more likely to be a result of inaccuracies in the applied formation factor. No shows were observed in the well.

No cores were cut and no wire line fluid samples were taken.

The well was permanently abandoned on 7 November 2007as a dry well.

Testing

No drill stem test was performed.

Around this wellbore

This wellbore on Sodir FactPages → · Press release →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/5626, documented in the API reference.