NORWAY · WELLBORES · NPDID 5685

6507/2-4

Exploration · Appraisal · P&A · Gas/condensate · Eni Norge AS · Marulk · PL 122

2 documents: reports, logs, and plots →

6507/2-4 is an appraisal exploration wellbore in the Norwegian Sea, drilled by Eni Norge AS, entered Nov 17, 2007, to 3,600 m in the Lyr Fm.

Discovery 6507/2-2 Marulk · On the map →

3,600
m total depth · 3,600 m vertical
365
m water depth
Nov 17, 2007
entered · completed Feb 19, 2008
Lyr Fm
at total depth · Early Cretaceous
27.8
m of core in 3 cores
126
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED NOV 4, 2026 · RELEASED FEB 19, 2010

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
WEST ALPHA · Semisub steel
Drilling days
95
Kelly bushing elevation
18 m
Maximum inclination
2°
Drilling permit
1163-L
Licensing round
10-B
Plugged and abandoned
—
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
65.94095° N, 7.59394° E
Hydrocarbons in
Lysing Fm · Late Cretaceous

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

Well 6507/2-4 was drilled on the Marulk structure on the Dønna Terrace in the Norwegian Sea. The main purpose was to appraise the Lysing Formation discovery in the previous well 6507/2-2, and to confirm the reserves down flank. Lange Formation (Intra Lange sandstones UL2 and UL1) was the secondary target. Planned TD was set 50 m into the Jurassic.

Operations and results

Appraisal well 6507/2-4 was spudded with the semi-submersible installation West Alpha on 17 November 2007 and drilled to TD at 3600 m in the Early Cretaceous Lyr Formation. Operations proceeded without really serious problems, but in the 12 1/4" and 8 1/2" sections a considerable amount of time was NPT due bad weather conditions and hole instability with tendency of stuck BHA. Due to very low rate of penetration it was agreed among the License Partners to set TD in the Cretaceous Lyr Formation. The well was drilled with sea water and hi-vis sweeps down to 1350 m and with Ultradril mud from 1350 m to TD.

All stratigraphic tops were encountered generally 10-27 meters higher than expected; Lysing formation was found 10.4 m higher than prognosed, UL2 sandstone 14.5 m deepest and UL1sandstone was hit 19 m higher. The primary target Lysing sandstone was found at 2832 m and was found Gas/Condensate bearing all through down to a GDT at 2853 m. Unit UL2 was found water bearing at 3331.5 m, composed by many sand layers interbedded with claystone. Unit UL1 was found at oil bearing at 3378.5 m, consisting in one sand body 3 meters thick. Oil shows and gas peaks were recorded in numerous thin sandstone stringers in the Lange Formation between 3320 m and 3465 m.

One core was cut from 2835 to 2852 m in the Lysing

Around this wellbore

This wellbore on Sodir FactPages → · Press release →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.