NORWAY · WELLBORES · NPDID 5766
6507/11-9
Exploration · Wildcat · P&A · Gas · StatoilHydro Petroleum AS · Halten Øst · PL 263
6507/11-9 is a wildcat exploration wellbore in the Norwegian Sea, drilled by StatoilHydro Petroleum AS, entered Mar 12, 2008, to 3,069 m in the Båt Gp.
Discovery 6507/11-9 (Natalia) · On the map →
- 3,069
- m total depth · 3,058 m vertical
- 281
- m water depth
- Mar 12, 2008
- entered · completed Apr 18, 2008
- Båt Gp
- at total depth · Early Jurassic
- 20.3
- m of core in 1 core
- 109
- °C bottom-hole temperature
SODIR FACTPAGES · RECORD UPDATED NOV 4, 2026 · RELEASED APR 18, 2010
On file for this wellbore
What the Directorate holds from this wellbore. Each opens the section that lists it.
Drilling
- Drilling facility
- WEST ALPHA · Semisub steel
- Drilling days
- 38
- Kelly bushing elevation
- 18 m
- Maximum inclination
- 9.30000019°
- Drilling permit
- 1167-L
- Licensing round
- 16
- Plugged and abandoned
- —
- Core samples available
- Yes
- Cuttings samples available
- Yes
- Position · ED50
- 65.15217° N, 7.41961° E
- Hydrocarbons in
- Garn Fm · Middle Jurassic
Well history
WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE
General
Well 6507/11-9 was drilled on the Natalia prospect in the Grinda Graben, ca 5 km north of the Midgard Field in the Norwegian Sea. The structure is a rotated fault block and comprise of Jurassic reservoir sandstones. It was drilled up-dip from the previously drilled 6507/11-4 on the structure. The primary objective of the well was to prove presence of hydrocarbons in Jurassic sandstones in the Fangst Group. The secondary target was to examine the hydrocarbon migration route in the prospect area.
Operations and results
The rig arrived at the 6507/11-9 location already on 20 February 2008, but had to wait 20 days due to bad weather before setting anchors. The well was spudded with the semi-submersible rig West Alpha on 12 March 2008 and drilled to TD at 3069 m in sandstones and claystones of the Early Jurassic Båt Group. No shallow gas was observed by the ROV at the wellhead or by the MWD while drilling the 26" hole. The well was drilled with spud mud down to 810 m and with Glydril mud from 810 m to TD.
The well penetrated rocks of Quaternary, Tertiary, Cretaceous and Jurassic age. The well penetrated the Garn reservoir section at 2597 m, 24.2 m shallower than prognosed. The well proved a ca 40 m gas column in the Garn Formation; with a gas-down-to top Not Formation at 2637.8 m (2612 m TVD MSL). The Ile Formation was water bearing. The first water bearing sand to be penetrated below the hydrocarbon column was in the Not Formation at 2645 m (2619 m TVD MSL). The hydrocarbon contact for the Natalia structure is therefore expected to be between 2637.8 and 2645 m (2612 m and 2619 m TVD MSL respectively), if same pressure regime and hydrocarbon system up dip. The updated seismic interpretation indicates that the structure spill
Around this wellbore
This wellbore on Sodir FactPages → · Press release →
About this data
Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.
Developers: this page as JSON is GET /v1/data/norway/wells/5766, documented in the API reference.