NORWAY · WELLBORES · NPDID 5773

16/1-9

Exploration · Wildcat · P&A · Oil/gas · Noil Energy ASA · Ivar Aasen · PL 001 B

5 documents: reports, logs, and plots →

16/1-9 is a wildcat exploration wellbore in the North Sea, drilled by Noil Energy ASA, entered Feb 19, 2008, to 2,544 m in the Skagerrak Fm.

Discovery 16/1-9 Ivar Aasen · On the map →

2,544
m total depth · 2,536 m vertical
112
m water depth
Feb 19, 2008
entered · completed Apr 22, 2008
Skagerrak Fm
at total depth · Late Triassic
9.3
m of core in 1 core
91
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED NOV 4, 2026 · RELEASED APR 22, 2010

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
BREDFORD DOLPHIN · Semisub steel
Drilling days
64
Kelly bushing elevation
25 m
Maximum inclination
10°
Drilling permit
1169-L
Licensing round
1-A
Plugged and abandoned
—
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
58.91334° N, 2.20201° E
Hydrocarbons in
Sleipner Fm · Middle Jurassic
Hydrocarbons in
Skagerrak Fm · Late Triassic

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

The 16/1-9 Draupne prospect is located on the eastern margin of the South Viking Graben in the North Sea. The structure is situated in the eastern part of the Gudrun Terrace and the western flank of the Utsira High. The primary target was a faulted anticline trap within Hugin/Sleipner reservoir sandstones of Middle Jurassic Bajocian - Callovian age. A secondary target was mapped on a four way dip closure within the Paleocene top Heimdal level, the Gugne prospect. Well 16/1-9 was planned as a vertical well with TD ca 50 m into the Hugin/Sleipner Formation if water bearing, or ca 50 m into the Triassic Skagerrak Formation in case of a discovery.

Operations and results

Wildcat well 16/1-9 was spudded with the semi-submersible installation Bredford Dolphin on 19 February 2008 and drilled to TD at 2544 m in the Late Triassic Skagerrak Formation. A pilot hole was drilled prior to the 36" section. No signs of shallow gas were observed or seen on MWD logs. Significant downtime resulted from a shallow water flow beside the well (5.2 days), wait on weather (4.3 days), BOP acoustic failure (3.5 days), poor hole conditions (2.9 days) and stuck wire line (2.2 days). The well was drilled with Seawater and sweeps down to 600 m, with KCl/GEM mud from 600 m to 1281 m, and with Performadril mud from 1281 m to TD.

The secondary target Heimdal Formation was entered at 2126.0 m (2123.2 m TVD), approximately 100 meters deeper than the prognosed depth, and it was dry. The Sleipner Formation sandstone was encountered at 2399.0 m (2393.2 m TVD), 167 TVD meters deeper than prognosed. The Skagerrak Formation was encountered at 2411 m (2405 m TVD), 23 TVD meters shallower than prognosed. The wire line logs proved a thin gas cap from 2399 m (2368 m

Around this wellbore

This wellbore on Sodir FactPages → · Press release →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/5773, documented in the API reference.