NORWAY · WELLBORES · NPDID 5812
6605/8-2
Exploration · Wildcat · P&A · Dry · StatoilHydro Petroleum AS · PL 283
6605/8-2 is a wildcat exploration wellbore in the Norwegian Sea, drilled by StatoilHydro Petroleum AS, entered May 11, 2008, to 4,210 m in the Lange Fm.
- 4,210
- m total depth · 4,196 m vertical
- 818
- m water depth
- May 11, 2008
- entered · completed Jul 10, 2008
- Lange Fm
- at total depth · Late Cretaceous
- 47.5
- m of core in 3 cores
- 144
- °C bottom-hole temperature
SODIR FACTPAGES · RECORD UPDATED FEB 20, 2026 · RELEASED JUL 10, 2010
On file for this wellbore
What the Directorate holds from this wellbore. Each opens the section that lists it.
Drilling
- Drilling facility
- TRANSOCEAN LEADER · Semisub steel
- Drilling days
- 61
- Kelly bushing elevation
- 23.5 m
- Maximum inclination
- 12.60000038°
- Drilling permit
- 1181-L
- Licensing round
- 17
- Plugged and abandoned
- —
- Core samples available
- Yes
- Cuttings samples available
- Yes
- Position · ED50
- 66.31211° N, 5.52881° E
Well history
WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE
General
Well 6605/8-2 was drilled in 818 m water depth ca 6 km south-south west of the Stetind discovery well 6605/8-1 in the Vøring Basin of the Norwegian Sea. The main objective of the well was to prove and test hydrocarbons with focus on reservoir and production properties. The main target was sandstone of the Lysing Formation, estimated to be up to 70 m thick with significantly improved reservoir quality compared to the 6605/8-1 well. The well was drilled up-flank of the first well, with the aim to find improved reservoir quality. The well was the second exploration well to be drilled on the Stetind prospect.
Operations and results
Wildcat well 6605/8-2 was spudded with the semi-submersible installation Transocean Leader on 11 May 2008 and drilled to TD at 4210 m (4196 m TVD) in Late Turonian sediments of the Lange Formation. A 9 7/8" pilot hole was drilled to 2017.0 m in order to check for shallow gas or shallow water flow. Neither shallow gas nor shallow water flow was observed. No sirious problems were experienced in the operations, but some deviation around 3000 m led to a slight difference between MD and TVD (14 m at TD). Further, the MDT tool got stuck after a mini DST. The well was drilled with seawater and hi-vis sweeps down to 1290 m, with seawater/hi-vis sweeps/Glydril mud from 1290 m to 2850 m, and with oil based Paratec mud from 2850 m to TD.
The well penetrated rocks of Quaternary, Tertiary and Cretaceous age. The sandstones of the Lysing Formation had a gross thickness of 39 m; net to gross is 50%, total porosity 15% and water saturation 90%. The reservoir was thinner and of poorer quality than prognosed. The prognosed up-dip improvement in reservoir quality compared to the Stetind-1 well was not proved.</sp
Around this wellbore
This wellbore on Sodir FactPages → · Press release →
About this data
Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.
Developers: this page as JSON is GET /v1/data/norway/wells/5812, documented in the API reference.