NORWAY · WELLBORES · NPDID 5815

31/2-Y-12 Y1H

Development · Production · Plugged · Oil · StatoilHydro ASA · Troll · PL 054

31/2-Y-12 Y1H is a production development wellbore in the North Sea, drilled by StatoilHydro ASA, entered Apr 21, 2008, to 5,023 m.

Discovery 31/2-1 (Troll Vest) · On the map →

5,023
m total depth · 1,586 m vertical
333.8
m water depth
Apr 21, 2008
entered · completed May 28, 2008
—
at total depth
—
m of core
—
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED SEP 2, 2026 · RELEASED MAY 28, 2010

On file for this wellbore

Nothing yet. The Directorate has no tops, samples, logs, or documents on file for this wellbore; material from a new well is released two years after completion.

Drilling

Drilling facility
DEEPSEA TRYM · Semisub steel
Drilling days
38
Kelly bushing elevation
25 m
Maximum inclination
—°
Drilling permit
2947-P1
Licensing round
4
Plugged and abandoned
Jun 1, 2016
Core samples available
No
Cuttings samples available
No
Position · ED50
60.84929° N, 3.58172° E

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/5815, documented in the API reference.