NORWAY · WELLBORES · NPDID 5824
15/12-20 S
Exploration · Wildcat · Re-class to dev · Oil · Talisman Energy Norge AS · Varg · PL 038
15/12-20 S is a wildcat exploration wellbore in the North Sea, drilled by Talisman Energy Norge AS, entered May 28, 2008, to 4,192 m in the Skagerrak Fm.
Discovery 15/12-20 S · On the map →
- 4,192
- m total depth · 3,141.5 m vertical
- 84
- m water depth
- May 28, 2008
- entered · completed Jul 1, 2008
- Skagerrak Fm
- at total depth · Late Triassic
- 81.1
- m of core in 2 cores
- 123
- °C bottom-hole temperature
SODIR FACTPAGES · RECORD UPDATED NOV 4, 2026 · RELEASED JUL 1, 2010
On file for this wellbore
What the Directorate holds from this wellbore. Each opens the section that lists it.
Drilling
- Drilling facility
- MÆRSK GIANT · Jack-up 3 legs
- Drilling days
- 35
- Kelly bushing elevation
- 51.5 m
- Maximum inclination
- 56.59999847°
- Drilling permit
- 1184-L
- Licensing round
- 3
- Plugged and abandoned
- —
- Core samples available
- Yes
- Cuttings samples available
- Yes
- Position · ED50
- 58.07793° N, 1.89049° E
- Hydrocarbons in
- Sleipner Fm · Middle Jurassic
Well history
WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE
General
Well 15/12-20 S was drilled from the Varg Field production Platform in the southern Viking Graben in the North Sea. The primary objective of the well was to explore a potential undrained compartment in Triassic sands. A secondary objective was potential Late Jurassic sands that could exist above the Triassic sands.
Operations and results
Wildcat well 15/12-20 S was drilled with the jack-up installation Mærsk Giant, as a sidetrack from development well 15/12-A-7 on the Varg Field. It was kicked off 28 May 2008 from 1306 m, just above the 13 3/8" casing in the 15/12-A-7 development well, and drilled to TD at 4192 m (3142 m TVD) in the Late Triassic Skagerrak Formation. Significant operational problems were not encountered although 21% of the rig time was counted as non-productive. The main contributor to non-productive time was failure to mill the window in the 13 3/8" casing during kick-off. The well was drilled with Carbo-Sea oil based mud from kick-off to TD.
The Oxfordian Sandstone that makes up the reservoir over Varg Field was absent as forecast. A discovery was made in Middle Jurassic Sleipner Formation sandstone. This sand, encountered at 3808 m, was not prognosed. It contained oil down to a lithological contact at ca 3842 m (2878 m TVD SS). The underlying Triassic was encountered at 3874 m and was dry. Good shows on sandstones were reported in cuttings at 3810 and all through to the end of the cores at 3875 m. Formation Gas peaks up to a maximum of 4% were seen in the Sleipner formation. Resistivity was initially high, 15 ? 30 ohm/m from 3812 m (after the coal) and dropped off at 3835m MD to 0.3 - 0.8 ohm/m.
Two cores were taken (26.26 m and 54.85 m)
Around this wellbore
This wellbore on Sodir FactPages → · Press release →
About this data
Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.