NORWAY · WELLBORES · NPDID 5865

15/9-A-13

Development · Observation · Plugged · Not applicable · StatoilHydro ASA · Sleipner Øst · PL 046

15/9-A-13 is an observation development wellbore in the North Sea, drilled by StatoilHydro ASA, entered Nov 14, 2008, to 4,084 m.

Discovery 15/9-9 Sleipner Øst · On the map →

4,084
m total depth · 2,561 m vertical
82
m water depth
Nov 14, 2008
entered · completed Jan 2, 2009
—
at total depth
—
m of core
—
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED SEP 2, 2026 · RELEASED JAN 2, 2011

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
SLEIPNER A · Condeep 4 shafts
Drilling days
50
Kelly bushing elevation
78 m
Maximum inclination
—°
Drilling permit
2983-P
Licensing round
3
Plugged and abandoned
Jan 2, 2009
Core samples available
No
Cuttings samples available
No
Position · ED50
58.36736° N, 1.90834° E

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/5865, documented in the API reference.