NORWAY · WELLBORES · NPDID 5865
15/9-A-13
Development · Observation · Plugged · Not applicable · StatoilHydro ASA · Sleipner Øst · PL 046
15/9-A-13 is an observation development wellbore in the North Sea, drilled by StatoilHydro ASA, entered Nov 14, 2008, to 4,084 m.
Discovery 15/9-9 Sleipner Øst · On the map →
- 4,084
- m total depth · 2,561 m vertical
- 82
- m water depth
- Nov 14, 2008
- entered · completed Jan 2, 2009
- —
- at total depth
- —
- m of core
- —
- °C bottom-hole temperature
SODIR FACTPAGES · RECORD UPDATED SEP 2, 2026 · RELEASED JAN 2, 2011
On file for this wellbore
What the Directorate holds from this wellbore. Each opens the section that lists it.
Drilling
- Drilling facility
- SLEIPNER A · Condeep 4 shafts
- Drilling days
- 50
- Kelly bushing elevation
- 78 m
- Maximum inclination
- —°
- Drilling permit
- 2983-P
- Licensing round
- 3
- Plugged and abandoned
- Jan 2, 2009
- Core samples available
- No
- Cuttings samples available
- No
- Position · ED50
- 58.36736° N, 1.90834° E
Around this wellbore
This wellbore on Sodir FactPages →
About this data
Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.
Developers: this page as JSON is GET /v1/data/norway/wells/5865, documented in the API reference.