NORWAY · WELLBORES · NPDID 5919

30/11-7

Exploration · Wildcat · P&A · Gas/condensate · StatoilHydro Petroleum AS · Fulla · PL 035 B

1 document: reports, logs, and plots →

30/11-7 is a wildcat exploration wellbore in the North Sea, drilled by StatoilHydro Petroleum AS, entered Nov 12, 2008, to 4,067 m in the Drake Fm.

Discovery 30/11-7 Fulla · On the map →

4,067
m total depth · 4,067 m vertical
111
m water depth
Nov 12, 2008
entered · completed Feb 3, 2009
Drake Fm
at total depth · Early Jurassic
15
m of core in 1 core
139
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED NOV 4, 2026 · RELEASED FEB 3, 2011

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
WEST ALPHA · Semisub steel
Drilling days
84
Kelly bushing elevation
18 m
Maximum inclination
2.5°
Drilling permit
1195-L
Licensing round
2-A
Plugged and abandoned
—
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
60.00590° N, 2.37378° E
Hydrocarbons in
Ness Fm · Middle Jurassic

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

Well 30/11-7 was drilled on the eastern flank of the Central Viking Graben, NE of the Frigg Field in the North Sea. The main objectives were to prove gas condensate in the Fulla structure, establish the gas/water contact in the reservoir, and verify Brent Group reservoir quality. Further objectives were to verify reservoir pressure conditions and vertical communication in reservoir. The TD of the well was planned 50 m into the Drake Formation, or to 4068 m TVD RKB.

Operations and results

Wildcat well 30/11-7 was spudded with the semi-submersible installation West Alpha on 12 November 2008 and drilled to TD at 4067 m in the Early Jurassic Drake Formation. No shallow gas was observed by the ROV or on the MWD while drilling the 36" or the 26" holes. Boulders gave slow penetration and heavy vibration between 250 to 300 m. In the 17 1/2" section from 1334 to 3014 m hard rocks, carbonate stringers and cemented sandstone stringers caused slow penetration and numerous bit changes. Intermediate wire line logging was performed at 2910 m while a leak in the top drive DDM was repaired. In the wire line logging at final TD the MDT tool got stuck and was left in the hole. The well was drilled with seawater and spud mud down to 1331 m and with Versatec oil based mud from 1331 m to TD.

The 30/11-7 well penetrated rocks of Quaternary, Tertiary, Cretaceous and Jurassic age. A 12 m thick Draupne Formation shale was encountered at 3722 m overlying a 219 m thick Heather Formation. The main prognosed reservoir sandstones of the Tarbert Formation were not encountered in the well. Top Brent Group, Ness Formation, was encountered at 3953 m. The well proved a lean gas-condensate in sandstone

Around this wellbore

This wellbore on Sodir FactPages → · Press release →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/5919, documented in the API reference.