NORWAY · WELLBORES · NPDID 5971
34/8-A-14 H
Development · Production · Producing · Water · StatoilHydro ASA · Visund · PL 120
34/8-A-14 H is a production development wellbore in the North Sea, drilled by StatoilHydro ASA, entered Nov 26, 2008, to 3,771 m.
Discovery 34/8-1 Visund · On the map →
- 3,771
- m total depth · 1,430 m vertical
- 335
- m water depth
- Nov 26, 2008
- entered · completed Sep 15, 2009
- —
- at total depth
- —
- m of core
- —
- °C bottom-hole temperature
SODIR FACTPAGES · RECORD UPDATED NOV 4, 2026 · RELEASED SEP 15, 2011
On file for this wellbore
What the Directorate holds from this wellbore. Each opens the section that lists it.
Drilling
- Drilling facility
- VISUND · Semisub steel
- Drilling days
- 30
- Kelly bushing elevation
- 29 m
- Maximum inclination
- —°
- Drilling permit
- 3028-P
- Licensing round
- 10-A
- Plugged and abandoned
- —
- Core samples available
- No
- Cuttings samples available
- No
- Position · ED50
- 61.37013° N, 2.45794° E
Around this wellbore
This wellbore on Sodir FactPages →
About this data
Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.
Developers: this page as JSON is GET /v1/data/norway/wells/5971, documented in the API reference.