NORWAY · WELLBORES · NPDID 5975

2/1-13 S

Exploration · Wildcat · P&A · Oil/gas shows · Talisman Energy Norge AS · PL 299

1 document: reports, logs, and plots →

2/1-13 S is a wildcat exploration wellbore in the North Sea, drilled by Talisman Energy Norge AS, entered Nov 7, 2008, to 4,435 m in the Skagerrak Fm.

On the map →

4,435
m total depth · 4,358 m vertical
69
m water depth
Nov 7, 2008
entered · completed Mar 7, 2009
Skagerrak Fm
at total depth · Triassic
27.1
m of core in 1 core
161
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED FEB 20, 2026 · RELEASED JAN 3, 2011

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
MÆRSK GUARDIAN · Jack-up 3 legs
Drilling days
121
Kelly bushing elevation
41.3 m
Maximum inclination
21.39999962°
Drilling permit
1212-L
Licensing round
TFO2003
Plugged and abandoned
—
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
56.78597° N, 3.04159° E

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

Well 2/1-13 S was drilled on the TR3 prospect located on the south-western margin of the Hidra High, 14 km southwest of Gyda, 8 kilometres southwest of the Gyda South Field and 1.5 kilometres southwest of the closest well 2/1-11. The well was drilled in a more crestal position than 2/1-11. The primary target of the well was fluvial channel sands of the Triassic Skagerrak Formation. Secondary objective was the Bryne reservoir.

Operations and results

Well 2/1-13 S was spudded with the jack-up installation Maersk Guardian on 6 November 2008 and drilled to TD at 4435 m in the Triassic Skagerrak Formation. The 36" top hole was drilled to 214 m, followed by a 12 1/4" pilot hole to 620 m to check for shallow gas. Although some gas was encountered it was not of sufficient quantity or pressure to cause concern. Further drilling proceeded without significant problems down to TD in the 16" section at 2416 m. When running the 13 3/8" casing, it could not pass 2093 m. Due to due to well bore stability problems and the long rat hole left as a consequence of setting the casing shoe high, the well was sidetracked below the casing shoe. This technical sidetrack, 2/1-13 ST2, was drilled to final TD. The well was drilled with Pre‐hydrated Bentonite/CMC/seawater down to 620 m, with Versatec oil based mud from 620 m to 4149 m, and with Warp HTHP oil based mud from 4149 m to TD.

The top of the reservoir was encountered 63 m shallower than prognosed, at 4241 m (4124 m TVD SS) and had 1m of possible pay in sandstones in the interval 4252 to 4276 m. Shows were seen throughout this interv

Around this wellbore

This wellbore on Sodir FactPages → · Press release →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/5975, documented in the API reference.