NORWAY · WELLBORES · NPDID 5990

30/8-A-21 H

Development · Observation · Plugged · Not applicable · StatoilHydro Petroleum AS · Tune · PL 190

30/8-A-21 H is an observation development wellbore in the North Sea, drilled by StatoilHydro Petroleum AS, entered Dec 26, 2008, to 5,054 m.

Discovery 30/8-1 S Tune · On the map →

5,054
m total depth · 3,816 m vertical
92
m water depth
Dec 26, 2008
entered · completed Mar 10, 2009
—
at total depth
—
m of core
—
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED SEP 2, 2026 · RELEASED MAR 10, 2011

On file for this wellbore

Nothing yet. The Directorate has no tops, samples, logs, or documents on file for this wellbore; material from a new well is released two years after completion.

Drilling

Drilling facility
DEEPSEA DELTA · Semisub steel
Drilling days
75
Kelly bushing elevation
29 m
Maximum inclination
—°
Drilling permit
3037-P
Licensing round
14
Plugged and abandoned
Mar 13, 2009
Core samples available
No
Cuttings samples available
No
Position · ED50
60.45735° N, 2.60806° E

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/5990, documented in the API reference.