NORWAY · WELLBORES · NPDID 6008

9/2-C-2

Development · Production · Plugged · Dry · Talisman Energy Norge AS · Yme · PL 316

9/2-C-2 is a production development wellbore in the North Sea, drilled by Talisman Energy Norge AS, entered Jan 31, 2009, to 4,930 m.

Discovery 9/2-1 Yme · On the map →

4,930
m total depth · 3,233 m vertical
93
m water depth
Jan 31, 2009
entered · completed Sep 26, 2009
—
at total depth
—
m of core
—
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED SEP 2, 2026 · RELEASED SEP 26, 2011

On file for this wellbore

Nothing yet. The Directorate has no tops, samples, logs, or documents on file for this wellbore; material from a new well is released two years after completion.

Drilling

Drilling facility
MÆRSK GIANT · Jack-up 3 legs
Drilling days
33
Kelly bushing elevation
45.6 m
Maximum inclination
—°
Drilling permit
3047-P
Licensing round
18
Plugged and abandoned
Aug 2, 2010
Core samples available
No
Cuttings samples available
No
Position · ED50
57.81608° N, 4.53543° E

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/6008, documented in the API reference.