NORWAY · WELLBORES · NPDID 6051

2/1-A-16 B

Development · Production · P&A · Oil · Talisman Energy Norge AS · Gyda · PL 019 B

2/1-A-16 B is a production development wellbore in the North Sea, drilled by Talisman Energy Norge AS, entered Feb 14, 2009, to 4,938 m.

Discovery 2/1-3 Gyda · On the map →

4,938
m total depth · 4,083 m vertical
65.5
m water depth
Feb 14, 2009
entered · completed Mar 31, 2009
—
at total depth
—
m of core
—
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED SEP 2, 2026 · RELEASED MAR 31, 2011

On file for this wellbore

Nothing yet. The Directorate has no tops, samples, logs, or documents on file for this wellbore; material from a new well is released two years after completion.

Drilling

Drilling facility
GYDA · Jacket 6 legs
Drilling days
46
Kelly bushing elevation
56 m
Maximum inclination
—°
Drilling permit
3072-P
Licensing round
1-A
Plugged and abandoned
Mar 4, 2021
Core samples available
No
Cuttings samples available
No
Position · ED50
56.90487° N, 3.08511° E

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/6051, documented in the API reference.