NORWAY · WELLBORES · NPDID 6084

35/2-2

Exploration · Appraisal · P&A · Gas · StatoilHydro Petroleum AS · PL 318

1 document: reports, logs, and plots →

35/2-2 is an appraisal exploration wellbore in the North Sea, drilled by StatoilHydro Petroleum AS, entered Jun 2, 2009, to 640 m in the Naust Fm.

Discovery 35/2-1 (Peon) · On the map →

640
m total depth · 640 m vertical
372
m water depth
Jun 2, 2009
entered · completed Jul 26, 2009
Naust Fm
at total depth · Pliocene
—
m of core
15
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED NOV 4, 2026 · RELEASED JUL 26, 2011

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
TRANSOCEAN WINNER · Semisub steel
Drilling days
55
Kelly bushing elevation
26 m
Maximum inclination
1.79999995°
Drilling permit
1238-L
Licensing round
18
Plugged and abandoned
—
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
61.87672° N, 3.41417° E
Hydrocarbons in
Naust Fm · Pleistocene

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

Well 35/2-2 was drilled to appraise the Peon discovery on the Tampen Spur about one block west of the Agat discovery in the northern North Sea. The objectives were to establish reservoir properties and test the hydrocarbon potential of the Peon structure, verify Sandaband as a barrier for the production wells, and test gravel pack as completion design for future production wells. Other objectives for the well were to get further information about stress in the overburden, reservoir and underburden, acquire sonic and density data from the overburden 40m over the reservoir, and collect water samples.

Operations and results

Appraisal well 35/2-2 was spudded with the semi-submersible installation Transocean Winner on 2 June 2009 and drilled to TD at 640 m in Pliocene sediments of the Naust Formation. The seabed temperature was measured by two seabed memory gauges provided by Oceaneering. The seabed temperature oscillated between 5.8 to 6.7 deg C. An average of 6.3 deg C was taken as the seabed temperature. The well was drilled with seawater down to 429 m, with Sildril mud from 429 m to 571 m, and with Glydril Mud from 571 m to TD.

The geological model of Peon was confirmed by the well 35/2-2 and its technical sidetrack. Gas was encountered as expected from 580 down to a gas-water contact at 594 m in the Naust Formation "Peon sand". The gas is 99.98% methane with a carbon isotopic composition proving a biogenic origin. No oil shows were observed. A full set of wire line logs was acquired over the reservoir section; including sampling of a good quality water sample at 601 m. Sonic data was acquired in the overburden; however shear data is only available in the 8-1/2" section. Stress tests and extended leak-off test

Around this wellbore

This wellbore on Sodir FactPages → · Press release →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/6084, documented in the API reference.