NORWAY · WELLBORES · NPDID 6090

36/7-E-4 AY1H

Development · Production · Plugged · Oil · StatoilHydro Petroleum AS · Gjøa · PL 153

36/7-E-4 AY1H is a production development wellbore in the North Sea, drilled by StatoilHydro Petroleum AS, entered Apr 26, 2009, to 3,003 m.

Discovery 36/7-1 · On the map →

3,003
m total depth · 2,354 m vertical
360
m water depth
Apr 26, 2009
entered · completed Jul 5, 2009
—
at total depth
—
m of core
—
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED SEP 2, 2026 · RELEASED JUL 5, 2011

On file for this wellbore

Nothing yet. The Directorate has no tops, samples, logs, or documents on file for this wellbore; material from a new well is released two years after completion.

Drilling

Drilling facility
TRANSOCEAN SEARCHER · Semisub steel
Drilling days
43
Kelly bushing elevation
22 m
Maximum inclination
—°
Drilling permit
3093-P1
Licensing round
12
Plugged and abandoned
Jun 29, 2012
Core samples available
No
Cuttings samples available
No
Position · ED50
61.36366° N, 4.01486° E

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/6090, documented in the API reference.