NORWAY · WELLBORES · NPDID 61

6407/1-2

Exploration · Wildcat · P&A · Gas/condensate · Den norske stats oljeselskap a.s · Tyrihans · PL 073

43 documents: reports, logs, and plots →

6407/1-2 is a wildcat exploration wellbore in the Norwegian Sea, drilled by Den norske stats oljeselskap a.s, entered Nov 13, 1982, to 4,560 m in the Grey Beds (informal).

Discovery 6407/1-2 Tyrihans Sør · On the map →

4,560
m total depth · 4,558 m vertical
273
m water depth
Nov 13, 1982
entered · completed May 15, 1983
Grey Beds (informal)
at total depth · Late Triassic
57.1
m of core in 4 cores
159
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED NOV 4, 2026 · RELEASED MAY 15, 1985

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
DYVI DELTA · Semisub steel
Drilling days
184
Kelly bushing elevation
29 m
Maximum inclination
5°
Drilling permit
355-L
Licensing round
5
Plugged and abandoned
—
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
64.79739° N, 7.03993° E
Hydrocarbons in
Garn Fm · Middle Jurassic

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

The wildcat 6407/1-2 was drilled 43 m NW of well 6407/1-1, which was drilled to 900 m before it was junked due to problems with setting the 20" casing. The objective for both wells was to test for hydrocarbons in Jurassic sandstones. The primary target was Middle Jurassic sand horizons, Early Jurassic sands was secondary target. The well was the first well north of 62 degrees to encounter liquid petroleum.

The well is Type Well for the Kai Formation and Reference Well for the Nordland Group. It is Reference Well for the Lyr Formation, the Fangst Group, and the BÅt Group

Operations and results

Wildcat well 6407/1-2 was spudded with the semi-submersible installation Dyvi Delta on 13 November 1982 and drilled to TD at 4560 m in the Late Triassic Grey Beds. The well was drilled with seawater/gel down to 901 m, with gypsum/lignosulphonate from 901 m to 3568 m, and with Spersene/XP-20/resin from 3568 m to TD. At 1817 m loss of mud to the formation was discovered. A survey showed that this was caused by a collapse of 20" casing from approximately 667 m. It was therefore decided to run the 13 3/8" casing at this point. A total of 164 days were spent on the drilling phase, which was 56 days more than prognosed. 22 days were lost due to bad weather, 17 days due to BOP problems, 4 days working with the collapsed 20" casing, 7 days were spent on fishing when the drill string parted. A further 12 days were spent on excessive reaming in the 12 1/4" hole in the Paleocene and top of the Cretaceous formation, and in the 8 1/2" hole in the Heather formation. The reaming was necessary when running back in hole after several days WOW with the BOP closed and the riser disconnected. The well was drilled 60 meters deeper than prognosed. The testing phase lasted for 21 days, which includes a 7" casing tie back operation of 6 days, which was necessary because of a leak in the 9 5/8" at approximately 1850 m. The

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/61, documented in the API reference.