NORWAY · WELLBORES · NPDID 6123
6507/3-7
Exploration · Wildcat · P&A · Gas · StatoilHydro Petroleum AS · Idun Nord · PL 159 D
6507/3-7 is a wildcat exploration wellbore in the Norwegian Sea, drilled by StatoilHydro Petroleum AS, entered Jun 2, 2009, to 3,855 m in the Åre Fm.
Discovery 6507/3-7 Idun Nord · On the map →
- 3,855
- m total depth · 3,854.5 m vertical
- 377
- m water depth
- Jun 2, 2009
- entered · completed Jul 22, 2009
- Åre Fm
- at total depth · Early Jurassic
- 107
- m of core in 2 cores
- 145
- °C bottom-hole temperature
SODIR FACTPAGES · RECORD UPDATED NOV 4, 2026 · RELEASED JUL 22, 2011
On file for this wellbore
What the Directorate holds from this wellbore. Each opens the section that lists it.
Drilling
- Drilling facility
- OCEAN VANGUARD · Semisub steel
- Drilling days
- 51
- Kelly bushing elevation
- 22 m
- Maximum inclination
- 3.47000003°
- Drilling permit
- 1250-L
- Licensing round
- 12-B
- Plugged and abandoned
- —
- Core samples available
- Yes
- Cuttings samples available
- Yes
- Position · ED50
- 65.82342° N, 7.71892° E
- Hydrocarbons in
- Fangst Gp · Middle Jurassic
Well history
WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE
General
Well 6507/3-7 Idun Nord was drilled on the Eastern side of the Dønna Terrace in the Norwegian Sea, just north of the 6507/3-3 Idun Discovery. The main objective of the well was to prove hydrocarbons in the Middle Jurassic Fangst Group (Garn, Not and Ile Formation sandstones) and in the Early Jurassic Båt Group (Tilje and Åre Formation sandstones). A secondary target for the well was to test the hydrocarbon potential of the Cretaceous Intra Lange Formation sandstones.
Operations and results
Prior to spudding the main well, a 9 7/8" pilot hole 6507/3-U-2 was drilled approximately 15m east of this main wellbore 6507/3-7 location, to check for presence of shallow gas. No shallow gas was observed by the ROV at the wellhead and there were no indication on LWD, but the LWD confirmed thin water filled sands at 578 m, 648 m, 791 m, and 1142 m. Wildcat well 6507/3-7 was spudded with the semi-submersible installation Ocean Vanguard on 2 June 2009 and drilled to TD at 3855 m in the Early Jurassic Åre Formation. No LWD logs were run in the 36" and 26" sections of the main well bore. After drilling 3.5 m of the 8 1/2" section below the 9 5/8" shoe, a kick occurred. The pore pressure prognosis indicated 1.09 g/cm3 at top of the reservoir. The shut in well pressure estimated a pore pressure of 1.39 g/cm3. The kick was circulated out by driller's method and the mud weight increased from 1.25 g/cm3 to 1.45 g/cm3. The well was drilled with spud mud and hi-vis sweeps down to 1203 m, with Performadrill WBM from 1203 m to 2205 m, with Enviromul OBM (yellow class) from 2205 m to 3540 m, and with Performadrill WBM from 3540 m to TD.
6507/3-7 penetrated rocks of Quaternary, Tertiary, Cretaceous and Jurassic age. Top Garn For
Around this wellbore
This wellbore on Sodir FactPages → · Press release →
About this data
Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.
Developers: this page as JSON is GET /v1/data/norway/wells/6123, documented in the API reference.