NORWAY · WELLBORES · NPDID 6144
6506/12-12 S
Exploration · Wildcat · P&A · Oil/gas · StatoilHydro Petroleum AS · Åsgard · PL 094
6506/12-12 S is a wildcat exploration wellbore in the Norwegian Sea, drilled by StatoilHydro Petroleum AS, entered Jun 1, 2009, to 5,508 m in the Åre Fm.
Discovery 6506/12-12 S (Smørbukk Nordøst) · On the map →
- 5,508
- m total depth · 4,904 m vertical
- 301
- m water depth
- Jun 1, 2009
- entered · completed Aug 6, 2009
- Åre Fm
- at total depth · Early Jurassic
- 35
- m of core in 1 core
- —
- °C bottom-hole temperature
SODIR FACTPAGES · RECORD UPDATED NOV 4, 2026 · RELEASED AUG 6, 2011
On file for this wellbore
What the Directorate holds from this wellbore. Each opens the section that lists it.
Drilling
- Drilling facility
- TRANSOCEAN LEADER · Semisub steel
- Drilling days
- 67
- Kelly bushing elevation
- 23.5 m
- Maximum inclination
- 49.45000076°
- Drilling permit
- 1256-L
- Licensing round
- 8
- Plugged and abandoned
- —
- Core samples available
- Yes
- Cuttings samples available
- Yes
- Position · ED50
- 65.21700° N, 6.90827° E
- Hydrocarbons in
- Lange Fm · Late Cretaceous
- Hydrocarbons in
- Fangst Gp · Middle Jurassic
- Hydrocarbons in
- Båt Gp · Early Jurassic
Well history
WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE
General
Well 6506/12-12 S was drilled on the northern part of the Smørbukk structure on the Halten Terrace in the Norwegian Sea. The primary objective was to prove hydrocarbon saturation in the main target reservoir zones in a down flank position in the Smørbukk NE KG segment. Secondary objectives were to obtain pressure and stratigraphic control for placing a sidetrack (6506/12-12 A) for coring and field development (producer well); and to acquire data on the Cretaceous Grizzly prospect.
Operations and results
A 9 7/8" pilot hole, 6506/12-U-15, was drilled to 854 m prior to the main hole.
Well 6506/12-12 S was spudded with the semi-submersible installation Transocean Leader on 1 June 2009 and drilled to TD at 5508 m, 12 m into the Early Jurassic Åre Formation. No shallow gas was observed by the ROV or on the MWD logs while drilling the 9 7/8" shallow gas pilot hole or the 26" holes. A kick was taken in the top of the Garn Formation, just below the 9 5/8" casing shoe. The well was drilled with Seawater and bentonite down to 1061 m, with Performadril water based mud from 1061 m to 2244 m, and with XP-07 oil based mud from 2244 m to TD.
The 6506/12-12 S well penetrated rocks of Quaternary, Tertiary, Cretaceous and Jurassic age. The well penetrated the secondary targets in the Cretaceous Lysing and Lange Formations (Grizzly prospect) at 3534 m and 4088 m, respectively. Indications of hydrocarbons were observed in the core and cuttings in the Intra Lange Sandstone, but the reservoir quality did not look too promising. The top of the Garn Formation was encountered at 4769.50 m, which is 19 m deeper than prognosis. The main reservoir target, the Lower Ror sandstone un
Around this wellbore
This wellbore on Sodir FactPages → · Press release →
About this data
Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.
Developers: this page as JSON is GET /v1/data/norway/wells/6144, documented in the API reference.