16/1-11
Exploration · Appraisal · P&A · Oil/gas · Det norske oljeselskap ASA · Ivar Aasen · PL 001 B
16/1-11 is an appraisal exploration wellbore in the North Sea, drilled by Det norske oljeselskap ASA, entered Feb 23, 2010, to 2,625 m in the Skagerrak Fm.
Discovery 16/1-9 Ivar Aasen · On the map →
- 2,625
- m total depth · 2,625 m vertical
- 112
- m water depth
- Feb 23, 2010
- entered · completed Apr 26, 2010
- Skagerrak Fm
- at total depth · Late Triassic
- 135.9
- m of core in 5 cores
- 105
- °C bottom-hole temperature
SODIR FACTPAGES · RECORD UPDATED NOV 4, 2026 · RELEASED APR 26, 2012
On file for this wellbore
What the Directorate holds from this wellbore. Each opens the section that lists it.
Drilling
- Drilling facility
- SONGA DELTA · Semisub steel
- Drilling days
- 63
- Kelly bushing elevation
- 29 m
- Maximum inclination
- 1.39999998°
- Drilling permit
- 1261-L
- Licensing round
- 1-A
- Plugged and abandoned
- —
- Core samples available
- Yes
- Cuttings samples available
- Yes
- Position · ED50
- 58.92671° N, 2.18541° E
- Hydrocarbons in
- Sleipner Fm · Middle Jurassic
- Hydrocarbons in
- Skagerrak Fm · Late Triassic
Well history
WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE
General
Well 16/1-11 was drilled to appraise the 16/1-9 discovery on the Gudrun Terrace just west of the Utsira High in the North Sea. The discovery well 16/1-9 was completed in April 2008 and revealed oil shows in the Middle Jurassic Vestland Group, but neither coring or logging was completed according to programme due to hole problems. The extent and reservoir quality of the Sleipner Formation in the Vestland Group was a primary objective in the data acquisition programme for 16/1-11 and an extensive wire line logging suite was planned in order to get as much information as possible regarding the oil-water contact, depth conversion, reservoir thickness, facies, fluids, well productivity and possible barriers in the reservoir. The Sleipner Formation reservoir was prognosed to be 75 m thick and coring of the hydrocarbon bearing part of the reservoir was decided prior drilling. Planned TD was TD at 2579 m, approximately 100 metres below prognosed base of the Sleipner Formation.
Operations and results
Well 16/1-11 was spudded with the semi-submersible installation Songa Delta on 23 February 2010. The 8 1/2" section in was drilled to TD at 2625 m in the Skagerrak Formation. After logging problems with setting and cementing the 7" liner made it necessary to make a sidetrack, 16/1-11T2, in order to do a drill stem test. The 8 1/2" sidetrack was kicked off from 2193 m and drilled to 2532 m (2523 m TVD). The sidetrack was drilled deviated with up to 20 deg deviation at its TD. The well was drilled with seawater down to 603.5 m, with Aqua-drill mud with 6% glycol from 603.5 to 1770 m, and with Carbo-Sea oil based mud from 1770 m to TD.
Hydrocarbons were proven in the Sleipner and Skagerrak formations. Top Sleipner Formation c
Around this wellbore
This wellbore on Sodir FactPages → · Press release →
About this data
Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.