NORWAY · WELLBORES · NPDID 6210

30/9-24

Exploration · Wildcat · P&A · Dry · StatoilHydro Petroleum AS · PL 079

1 document: reports, logs, and plots →

30/9-24 is a wildcat exploration wellbore in the North Sea, drilled by StatoilHydro Petroleum AS, entered Sep 10, 2009, to 3,767 m in the Lunde Fm.

On the map →

3,767
m total depth · 3,764 m vertical
107.5
m water depth
Sep 10, 2009
entered · completed Oct 17, 2009
Lunde Fm
at total depth · Late Triassic
—
m of core
—
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED FEB 20, 2026 · RELEASED OCT 17, 2011

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
TRANSOCEAN LEADER · Semisub steel
Drilling days
38
Kelly bushing elevation
23.5 m
Maximum inclination
10.39999962°
Drilling permit
1272-L
Licensing round
Awarded additionally to round 6
Plugged and abandoned
—
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
60.48464° N, 2.71200° E

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

Well 30/9-24 was drilled on the Omega Nord Statfjord prospect, a rotated fault block, about 6 km southwest of the Oseberg field centre. The main objective of well 30/9-24 was to prove commercial accumulation of hydrocarbon in the Nansen and Eriksson Members in the Statfjord Formation. A secondary objective was to explore the Lower Statfjord reservoir. The TD of the well was planned to be into the Hegre Group.

Operations and results

Drilling operations were done from the semi-submersible installation Transocean Leader. Based on the site survey, shallow gas could not be excluded in the interval 272 to 480 m. A pilot hole, 30/9-24 U2, was therefore drilled on 10 September 2009 to 581 m, without identifying shallow gas. After the pilot the main well was spudded and drilled with a 17 1/2" hole to 1402 m with 30" conductor at 191 m. It was not possible to run the 13 3/8" casing below 253 m and it had to be pulled. It was also observed that the guideposts /PGB had subsided 4m. The well was therefore plugged, abandoned and named 30/9-24X.

Wildcat well 30/9-24 was finally spudded on 16 September 2009, 29.4 m in direction 135.3 deg from the original location. The 30" conductor was set at 226 m and a 17 1/2" hole was drilled to 1294 m. When pulling out of the hole, the drill string got stuck at 1269 m. The string was cut at 1078 m. A cement plug was set and a 13 3/8" casing was run with shoe at 1014 m. A sidetrack, 30/9-24 T2, was then drilled from 1070 m to final TD at 3767 m in the Triassic Lunde Formation. The well was drilled with sea water and hi-vis pills down to 1294 m in the original hole, and with Versatec oil based mud in the sidetrack from kick-off at 1078 m to final TD.

<p class=M

Around this wellbore

This wellbore on Sodir FactPages → · Press release →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/6210, documented in the API reference.