NORWAY · WELLBORES · NPDID 6241

24/9-P-3 AH

Development · Production · Plugged · Oil/gas · Marathon Petroleum Norge AS · Volund · PL 150

24/9-P-3 AH is a production development wellbore in the North Sea, drilled by Marathon Petroleum Norge AS, entered Dec 6, 2009, to 3,930 m.

Discovery 24/9-5 Volund · On the map →

3,930
m total depth · 1,969 m vertical
124
m water depth
Dec 6, 2009
entered · completed May 13, 2010
—
at total depth
—
m of core
—
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED SEP 2, 2026 · RELEASED MAY 13, 2012

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
SONGA DEE · Semisub steel
Drilling days
19
Kelly bushing elevation
25 m
Maximum inclination
—°
Drilling permit
3167-P
Licensing round
12
Plugged and abandoned
Apr 14, 2019
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
59.49574° N, 1.96544° E

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/6241, documented in the API reference.