NORWAY · WELLBORES · NPDID 6251

24/9-P-2 AY1H

Development · Production · Closed · Oil/gas · Marathon Petroleum Norge AS · Volund · PL 150

24/9-P-2 AY1H is a production development wellbore in the North Sea, drilled by Marathon Petroleum Norge AS, entered Jan 29, 2010, to 4,137 m.

Discovery 24/9-5 Volund · On the map →

4,137
m total depth · 1,965 m vertical
124
m water depth
Jan 29, 2010
entered · completed Feb 24, 2010
—
at total depth
—
m of core
—
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED SEP 2, 2026 · RELEASED FEB 24, 2012

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
SONGA DEE · Semisub steel
Drilling days
27
Kelly bushing elevation
25 m
Maximum inclination
—°
Drilling permit
3175-P1
Licensing round
12
Plugged and abandoned
—
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
59.49606° N, 1.96481° E

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/6251, documented in the API reference.