25/4-10 S is a wildcat exploration wellbore in the North Sea, drilled by Marathon Petroleum Norge AS, entered Oct 20, 2009, to 2,912 m in the Heimdal Fm.

Discovery 25/4-10 S · On the map →

2,912
m total depth · 2,211.8 m vertical
123
m water depth
Oct 20, 2009
entered · completed Nov 10, 2009
Heimdal Fm
at total depth · Paleocene
—
m of core
—
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED NOV 4, 2026 · RELEASED NOV 10, 2011

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
TRANSOCEAN WINNER · Semisub steel
Drilling days
22
Kelly bushing elevation
26 m
Maximum inclination
53.79999924°
Drilling permit
1283-L
Licensing round
15
Plugged and abandoned
—
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
59.51429° N, 2.00383° E
Hydrocarbons in
Hermod Fm · Paleocene

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

Well 25/4-10 S was drilled in the Vana Sub-basin in the North Sea. The objective was to test the hydrocarbon potential in the Viper prospect, a mapped injection feature of remobilised Hermod sands into overlying Balder Formation sediments, with analogies to the Volund field in the southwest.

Operations and results

Wildcat well 25/4-10 S was spudded with the semi-submersible installation Transocean Winner on 20 October 2009 and drilled to TD at 2912 m (2222 m TVD) in the Paleocene Heimdal Formation. Obstructions in the 17 1/2" section from 197 to 812 m made it difficult to run the 13 3/8" casing, but it was finally cemented in place at 797 m. The well was drilled with seawater and hi-vis pills down to 815 m and with Versatec OBM from 815 m to TD.

A 16.5 m TVD thick Hermod Formation injection sand was encountered at 2671 to 2698 m and was oil bearing with an oil water contact identified at 2682.9 m (2033.1 m TVDSS), 7 m TVD shallower than prognosed. The resulting 7 m TVD hydrocarbon column was insufficient to warrant the planned MDT logging run. Oil shows in the well, if any, were masked by the oil based mud.

No cores were cut and no wire line logs were run in the well. Consequently, no wire line fluid samples were taken.

The well was plugged back for sidetracking on 10 November 2009. It is classified as an oil discovery.

Testing

No drill stem test was performed.

Around this wellbore

This wellbore on Sodir FactPages → · Press release →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.