2/1-5 is a wildcat exploration wellbore in the North Sea, drilled by BP Norway Limited U.A., entered Nov 13, 1982, to 4,454 m in the Bryne Fm.

On the map →

4,454
m total depth · 4,454 m vertical
66
m water depth
Nov 13, 1982
entered · completed Apr 5, 1983
Bryne Fm
at total depth · Middle Jurassic
18.4
m of core in 1 core
157
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED MAR 1, 2026 · RELEASED APR 5, 1985

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
SEDCO 707 · Semisub steel
Drilling days
144
Kelly bushing elevation
24 m
Maximum inclination
9°
Drilling permit
353-L
Licensing round
1-A
Plugged and abandoned
—
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
56.79835° N, 3.20594° E
Hydrocarbons in
Ula Fm · Late Jurassic

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

Well 2/1-5 was drilled on the Cod Terrace of the Central Graben in the southern North Sea. The primary objective was test a Late Jurassic sandstone prospect on the south side of a large, central salt culmination in block 2/1. The prospect was developed by analogy with the 2/1-3 oil discovery (Gyda) on the north-western slope of the same salt high. There, the reservoir is a 60 to 90 m thick sand within the Farsund formation, with closure formed primarily by pinch out/truncation beneath the Mandal Formation on lapping on the central salt high. Secondary objectives were possible deeper reservoirs such as the Ula and Bryne Formations and the Triassic down to top salt.

Operations and results

Wildcat well 2/1-5 was spudded with the semi-submersible installation Sedco 707 on 13 November 1982 and drilled to TD at 4454 m. In the Cretaceous sequence the string got stuck and the well had to be sidetracked from 2882 m. After a drilling break at 4186 m an oil kick occurred with 21.5 m influx and oil appearing in the mud. RFT measurements in sandstone units below the oil kick showed pore pressures on a gradient equivalent to a mud weight of 2.10 g/cm. This gave little margin for safe onward drilling to Top Salt and the well was terminated in dark, carbonaceous mudstone of uncertain, possibly Early Jurassic age. The well was drilled with seawater/gel down to 635 m, with gypsum/lignosulfonate mud from 635 m to 3830 m, and with Lignosulphonate/lignite mud from 3830 m to TD.

Well 2/1-5 reached the Base Cretaceous Unconformity and the "Hot shale" at 3882 m as predicted. Coring was initiated when traces of sand were observed near the predicted "top reservoir", but only dark, carbonaceous mudstone/siltstone was recovered. In

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/63, documented in the API reference.