NORWAY · WELLBORES · NPDID 6340

15/12-A-7 C

Development · Injection · P&A · Water · Talisman Energy Norge AS · Varg · PL 038

15/12-A-7 C is an injection development wellbore in the North Sea, drilled by Talisman Energy Norge AS, entered Feb 6, 2010, to 4,065 m.

Discovery 15/12-4 Varg · On the map →

4,065
m total depth · 3,094 m vertical
84
m water depth
Feb 6, 2010
entered · completed Feb 16, 2010
—
at total depth
—
m of core
—
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED SEP 2, 2026 · RELEASED FEB 16, 2012

On file for this wellbore

Nothing yet. The Directorate has no tops, samples, logs, or documents on file for this wellbore; material from a new well is released two years after completion.

Drilling

Drilling facility
MÆRSK GUARDIAN · Jack-up 3 legs
Drilling days
11
Kelly bushing elevation
52.2 m
Maximum inclination
—°
Drilling permit
3218-P
Licensing round
3
Plugged and abandoned
Jan 12, 2018
Core samples available
No
Cuttings samples available
No
Position · ED50
58.07793° N, 1.89049° E

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/6340, documented in the API reference.