NORWAY · WELLBORES · NPDID 6354

15/3-9

Exploration · Wildcat · P&A · Oil/gas · Statoil Petroleum AS · Gudrun · PL 187

2 documents: reports, logs, and plots →

15/3-9 is a wildcat exploration wellbore in the North Sea, drilled by Statoil Petroleum AS, entered May 19, 2010, to 4,654 m in the Sleipner Fm.

Discovery 15/3-9 · On the map →

4,654
m total depth · 4,650.5 m vertical
108
m water depth
May 19, 2010
entered · completed Aug 13, 2010
Sleipner Fm
at total depth · Middle Jurassic
55.2
m of core in 2 cores
154
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED NOV 4, 2026 · RELEASED AUG 13, 2012

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
TRANSOCEAN LEADER · Semisub steel
Drilling days
87
Kelly bushing elevation
23.5 m
Maximum inclination
6.9000001°
Drilling permit
1306-L
Licensing round
14
Plugged and abandoned
—
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
58.82057° N, 1.77242° E
Hydrocarbons in
Intra Draupne Fm Ss · Late Jurassic
Hydrocarbons in
Hugin Fm · Middle Jurassic

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

Well 15/3-9 was drilled on the Brynhild prospect situated on the east flank of the south Viking Graben, west of the Utsira High. The Brynhild Prospect was interpreted as the eastwards continuation of the Gudrun Field. The main objective of the 15/3-9 well was to prove economical hydrocarbon columns in the Late Jurassic SST1 and the Late Jurassic SST2 of the Draupne Formation. The Hugin Formation was a secondary objective.

Operations and results

Wildcat well 15/3-9 (Brynhild) was drilled with the semi-submersible installation Transocean Leader. A pilot hole 15/3-U6 was drilled to 918 m. No shallow gas was observed by the ROV at the wellhead or by the MWD while drilling the pilot hole. The main well was spudded 15 m off the pilot-hole location on 19 May 2010 and drilled to the Ty Formation where the pipe got stuc stuck. It was not possible to get it loose. A technical sidetrack, 15/3-9 S T2 was decided. The sidetrack was kicked off from 2350 m and the well was drilled to TD at 4654 m in the Middle Jurassic Sleipner Formation without further significant problems. The well was drilled with Seawater and SW/PAC sweeps down to 1001 m, with Performadril WBM from 1001 m to 2724 m (primary well and sidetrack), and with XP-07 OBM from 2724 m to TD.

The Late Jurassic Draupne Formation was encountered at 3975 m with top Intra Draupne Formation SST1 sandstone at 4112 m. The SST1 was oil bearing down to an oil water contact was at 4132 m TVD. The prognosed SST2 sandstone was encountered at 4226 m and was entirely water filled. The Hugin Formation was encountered at 4475 m and contained both gas and oil, each fluid type with its own down-to contact. The Draupne SST1 had a net to gross ratio of 0.75, while the net to gross ratio in the Hugin

Around this wellbore

This wellbore on Sodir FactPages → · Press release →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/6354, documented in the API reference.