NORWAY · WELLBORES · NPDID 6354
15/3-9
Exploration · Wildcat · P&A · Oil/gas · Statoil Petroleum AS · Gudrun · PL 187
15/3-9 is a wildcat exploration wellbore in the North Sea, drilled by Statoil Petroleum AS, entered May 19, 2010, to 4,654 m in the Sleipner Fm.
Discovery 15/3-9 · On the map →
- 4,654
- m total depth · 4,650.5 m vertical
- 108
- m water depth
- May 19, 2010
- entered · completed Aug 13, 2010
- Sleipner Fm
- at total depth · Middle Jurassic
- 55.2
- m of core in 2 cores
- 154
- °C bottom-hole temperature
SODIR FACTPAGES · RECORD UPDATED NOV 4, 2026 · RELEASED AUG 13, 2012
On file for this wellbore
What the Directorate holds from this wellbore. Each opens the section that lists it.
Drilling
- Drilling facility
- TRANSOCEAN LEADER · Semisub steel
- Drilling days
- 87
- Kelly bushing elevation
- 23.5 m
- Maximum inclination
- 6.9000001°
- Drilling permit
- 1306-L
- Licensing round
- 14
- Plugged and abandoned
- —
- Core samples available
- Yes
- Cuttings samples available
- Yes
- Position · ED50
- 58.82057° N, 1.77242° E
- Hydrocarbons in
- Intra Draupne Fm Ss · Late Jurassic
- Hydrocarbons in
- Hugin Fm · Middle Jurassic
Well history
WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE
General
Well 15/3-9 was drilled on the Brynhild prospect situated on the east flank of the south Viking Graben, west of the Utsira High. The Brynhild Prospect was interpreted as the eastwards continuation of the Gudrun Field. The main objective of the 15/3-9 well was to prove economical hydrocarbon columns in the Late Jurassic SST1 and the Late Jurassic SST2 of the Draupne Formation. The Hugin Formation was a secondary objective.
Operations and results
Wildcat well 15/3-9 (Brynhild) was drilled with the semi-submersible installation Transocean Leader. A pilot hole 15/3-U6 was drilled to 918 m. No shallow gas was observed by the ROV at the wellhead or by the MWD while drilling the pilot hole. The main well was spudded 15 m off the pilot-hole location on 19 May 2010 and drilled to the Ty Formation where the pipe got stuc stuck. It was not possible to get it loose. A technical sidetrack, 15/3-9 S T2 was decided. The sidetrack was kicked off from 2350 m and the well was drilled to TD at 4654 m in the Middle Jurassic Sleipner Formation without further significant problems. The well was drilled with Seawater and SW/PAC sweeps down to 1001 m, with Performadril WBM from 1001 m to 2724 m (primary well and sidetrack), and with XP-07 OBM from 2724 m to TD.
The Late Jurassic Draupne Formation was encountered at 3975 m with top Intra Draupne Formation SST1 sandstone at 4112 m. The SST1 was oil bearing down to an oil water contact was at 4132 m TVD. The prognosed SST2 sandstone was encountered at 4226 m and was entirely water filled. The Hugin Formation was encountered at 4475 m and contained both gas and oil, each fluid type with its own down-to contact. The Draupne SST1 had a net to gross ratio of 0.75, while the net to gross ratio in the Hugin
Around this wellbore
This wellbore on Sodir FactPages → · Press release →
About this data
Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.
Developers: this page as JSON is GET /v1/data/norway/wells/6354, documented in the API reference.