NORWAY · WELLBORES · NPDID 6405

6507/5-J-1 H

Development · Production · Producing · Oil · BP Norge AS · Skarv · PL 212

6507/5-J-1 H is a production development wellbore in the Norwegian Sea, drilled by BP Norge AS, entered Jun 19, 2010, to 5,105 m.

Discovery 6507/5-1 Skarv · On the map →

5,105
m total depth · 3,678 m vertical
325
m water depth
Jun 19, 2010
entered · completed Jun 21, 2013
—
at total depth
43
m of core in 1 core
—
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED NOV 4, 2026 · RELEASED JUN 21, 2015

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
BORGLAND DOLPHIN · Semisub steel
Drilling days
55
Kelly bushing elevation
23 m
Maximum inclination
—°
Drilling permit
3247-P
Licensing round
15
Plugged and abandoned
—
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
65.73825° N, 7.65134° E

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/6405, documented in the API reference.