NORWAY · WELLBORES · NPDID 6406

6507/5-J-2 H

Development · Injection · Producing · Gas · BP Norge AS · Skarv · PL 212

6507/5-J-2 H is an injection development wellbore in the Norwegian Sea, drilled by BP Norge AS, entered Jun 20, 2010, to 4,138 m.

Discovery 6507/5-1 Skarv · On the map →

4,138
m total depth · 3,662 m vertical
325
m water depth
Jun 20, 2010
entered · completed Sep 15, 2012
—
at total depth
—
m of core
—
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED NOV 4, 2026 · RELEASED SEP 15, 2014

On file for this wellbore

Nothing yet. The Directorate has no tops, samples, logs, or documents on file for this wellbore; material from a new well is released two years after completion.

Drilling

Drilling facility
BORGLAND DOLPHIN · Semisub steel
Drilling days
26
Kelly bushing elevation
23 m
Maximum inclination
—°
Drilling permit
3248-P
Licensing round
15
Plugged and abandoned
—
Core samples available
No
Cuttings samples available
No
Position · ED50
65.73827° N, 7.65147° E

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/6406, documented in the API reference.