NORWAY · WELLBORES · NPDID 6469

3/7-A-1 AH

Development · Production · Closed · Gas/condensate · DONG E&P Norge AS · Trym · PL 147

3/7-A-1 AH is a production development wellbore in the North Sea, drilled by DONG E&P Norge AS, entered Oct 21, 2010, to 4,934 m.

Discovery 3/7-4 Trym · On the map →

4,934
m total depth · 3,456 m vertical
65.4
m water depth
Oct 21, 2010
entered · completed Nov 19, 2010
—
at total depth
—
m of core
—
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED OCT 8, 2026 · RELEASED NOV 19, 2012

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
MÆRSK GIANT · Jack-up 3 legs
Drilling days
30
Kelly bushing elevation
42 m
Maximum inclination
—°
Drilling permit
3290-P
Licensing round
12
Plugged and abandoned
—
Core samples available
No
Cuttings samples available
No
Position · ED50
56.38191° N, 4.23743° E

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/6469, documented in the API reference.