NORWAY · WELLBORES · NPDID 6492

25/4-L-2 Y1H

Development · Production · Closed · Oil · Marathon Petroleum Norge AS · Alvheim · PL 036 C

25/4-L-2 Y1H is a production development wellbore in the North Sea, drilled by Marathon Petroleum Norge AS, entered Oct 28, 2010, to 6,167 m.

Discovery 24/6-2 Alvheim · On the map →

6,167
m total depth · 2,160 m vertical
120.7
m water depth
Oct 28, 2010
entered · completed Jan 1, 2011
—
at total depth
—
m of core
—
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED SEP 2, 2026 · RELEASED JAN 1, 2013

On file for this wellbore

Nothing yet. The Directorate has no tops, samples, logs, or documents on file for this wellbore; material from a new well is released two years after completion.

Drilling

Drilling facility
SONGA DEE · Semisub steel
Drilling days
42
Kelly bushing elevation
25 m
Maximum inclination
—°
Drilling permit
3300-P1
Licensing round
2-A
Plugged and abandoned
—
Core samples available
No
Cuttings samples available
No
Position · ED50
59.58579° N, 2.08617° E

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/6492, documented in the API reference.