6305/9-2 is a wildcat exploration wellbore in the Norwegian Sea, drilled by Det norske oljeselskap ASA, entered Dec 26, 2010, to 3,075 m in the Springar Fm.

On the map →

3,075
m total depth · 3,075 m vertical
274
m water depth
Dec 26, 2010
entered · completed Mar 13, 2011
Springar Fm
at total depth · Late Cretaceous
—
m of core
—
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED FEB 20, 2026 · RELEASED NOV 14, 2012

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
AKER BARENTS · Semisub steel
Drilling days
78
Kelly bushing elevation
40 m
Maximum inclination
1.29999995°
Drilling permit
1332-L
Licensing round
TFO2007
Plugged and abandoned
—
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
63.44774° N, 5.91483° E

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

The exploration well 6305/9-2 is located in the northern part of block 6305/9, 25 km east of the Ormen Lange field. The main objective was to test the presence of hydrocarbons in the Dovregubben prospect, in the Palaeocene Tang Formation channel sandstones. Secondary prospects were identified in the Paleocene Egga Formation and in the Late Cretaceous Springar Formation.

Operations and results

Wildcat well 6305/9-2 was spudded with the semi-submersible installation Aker Barents on 26 December 2010 and drilled to TD at 3075 m in the Late Cretaceous Springar Formation. After the 36" section a 9 7/8" pilot hole was drilled from 381 m to 496 m using seawater and hi-vis pills to check for shallow gas. Shallow gas was detected in a sandy interval from 484 m to 486 m. The pilot was cemented and opened up/drilled with 26" BHA down to 477 m where 20" casing was set, shallower than planned due to the shallow gas. While drilling the succeeding 17 1/2" section gas peaks (drilled gas) were recorded at 485 m (2.8%), 577 m (2.7%) and 636 m (2.4%) in sandy intervals. The well took significantly longer time than planned. The main causes for this was hole problems (134.5 hrs) and WOW (472.5 hrs, of which 386.5 hrs occurred after pulling riser and BOP, before final anchor handling and abandonment). The well was drilled with seawater and bentonite down to 477 m, with seawater and polymer mud from 477 m to 671 m, and with Glydril mud (3.5 - 5.1% glycol) from 671 m to TD.

The geology and the depth prognosis of the well came in very much as prognosed. The Tang Formation sandstones were thinner than expected, and with poorer reservoir quality. The secondary targets contained Egga Formation reservoir and thin Springar Formati

Around this wellbore

This wellbore on Sodir FactPages → · Press release →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/6502, documented in the API reference.